FY26 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research (CINR Infrastructure NOFO)
Financial Assistance
Notice of Funding Opportunity Number: DE-FOA-0003541
Part 2 (Fixed DOE Requirements): FY26 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research
This is Part 2 of the Notice of Funding Opportunity (NOFO). The NOFO Part 2 is intended as a companion document to the NOFO Part 1. The NOFO Part 1 describes the specific Department of Energy (DOE) programmatic goals and evaluation criteria, eligibility, and other components that are specific to each funding opportunity.
Part 2 includes fixed DOE requirements that generally do not change from NOFO to NOFO. This document includes standard information for the application phase and describes expectations for award negotiations and post-award requirements for selected applications. Applicants should review both the NOFO Part 1 and the NOFO Part 2 prior to applying.
Table of Contents
I. GET REGISTERED
- SAM.gov Registration
- Unique Entity Identifier (UEI)
- Grants.gov Registration
- NEUP.gov
II. ELIGIBILITY
- A. Cost Sharing
-
- Legal Responsibility
-
- Cost Share Allocation
-
- Cost Share Types and Allowability
-
- Unallowable Cost Share Sources
-
- Cost Share Contributions by FFRDCs
-
- Cost Share Verification
-
- Cost Share Calculation Examples
-
- B. Other Eligibility Information
-
- Questions Regarding Eligibility
-
- Entity of Concern Prohibition
-
- Artificial Intelligence (AI) Application Use
-
III. PROGRAM DESCRIPTION
- A. Informational Webinar
IV. APPLICATION CONTENT AND FORM
- A. Application Format Summary
- B. Application Content Requirements
-
- Conflict of Interest (COI) Acknowledgement
-
- Application for Federal Assistance (SF-424)
-
- Project/Performance Site Location(s)
-
- Project Summary/Abstract File
-
- Project Summary Slide
-
- Resume
-
- Budget Information Non-Construction Programs (SF-424A)
-
- Cost Sharing Letter(s) of Commitment
-
- Budget Justification
-
- Vendor Quotes
-
- Current and Pending Support
-
- Potentially Duplicative Funding Notice
-
- Lobbying Activities
-
- Transparency of Foreign Connections
-
- Impacted Indian Tribes Documentation (if applicable)
-
- D. Funding Restrictions
-
- Allowable Costs
-
- Pre-Award Costs
-
- Performance of Work in the U.S. Requirement
-
- Foreign Travel
-
- Lobbying
-
- Equipment and Supplies
-
- Davis-Bacon Act Requirements
-
V. SUBMISSION REQUIREMENTS AND DEADLINES
VI. APPLICATION REVIEW INFORMATION
- A. Standard Evaluation and Selection Processes
-
- Overview
-
- Pre-Selection Clarification
-
- Recipient Responsibility and Qualifications
-
- Due Diligence Review for Research, Technology and Economic Security
-
- Evaluation and Administration by Non-Federal Personnel
-
- Selection
-
VII. SELECTION AND AWARD NOTICES
- A. Selection Notices
-
- Ineligible Submissions
-
- Application Notifications
-
- Applicants Selected for Award Negotiations
-
- Alternate Selections
-
- Applicants Not Selected for Award Negotiations
-
- B. Post-Selection Information Requests
-
- Example Information Requests
-
- Entity Risk Assessment
-
- Environmental Review in Accordance with National Environmental Policy Act (NEPA)
-
- Flood Resilience
-
- Trafficking in Persons
-
- Operations Workforce Continuity Plan
-
- C. Award Notices
VIII. AWARD ADMINISTRATION INFORMATION
- A. Post-Award Requirements and Administration
-
- Award Administrative Requirements
-
- Subaward and Executive Reporting
-
- National Policy Requirements
-
- Applicant Representations and Certifications
-
- Statement of Federal Stewardship
-
- Uniform Commercial Code (UCC) Financing Statements
-
- Interim Conflict of Interest Policy for Financial Assistance
-
- Whistleblower Protections
-
- Fraud, Waste, and Abuse
-
- Participants and Collaborating Organizations
-
- Current and Pending Support
-
- Prohibition Related to Malign Foreign Talent Recruitment Programs
-
- Foreign Collaboration Considerations
-
- U.S. Manufacturing Commitments
-
- Subject Invention Utilization Reporting
-
- Intellectual Property Provisions
-
- Conference Spending
-
- Cost Share Payment
-
- Implementation of Executive Order 13798, Promoting Free Speech and Religious Liberty
-
- Pay Transparency Requirements
-
- Human Subjects Research
-
- B. Reporting
IX. OTHER INFORMATION
- A. Government Right to Reject or Negotiate
- B. Commitment of Public Funds
- C. Treatment of Application Information
- D. Notice Regarding Eligible/Ineligible Activities
- E. Notice of Right to Conduct a Review of Financial Capability
- F. Requirement for Full and Complete Disclosure
- G. Retention of Submissions
- H. Title to Subject Inventions
- I. Government Rights in Subject Inventions
- J. Copyright
- K. Export Control
- L. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment
- M. Personally Identifiable Information (PII)
- N. Annual Independent Audits
- O. Buy America Requirements for Infrastructure Projects; Required Use of American Iron, Steel, Manufactured Products, and Construction Materials Produced in the U.S.
- P. Acronyms
I. GET REGISTERED
There are several required one-time actions applicants must take before applying to this NOFO. Some of these actions may take several weeks, so it is vital applicants build in enough time to complete them. Failure to complete these actions could interfere with application or negotiation deadlines or the ability to receive an award if selected. If you are already registered, make sure your registration is active and up to date. All registrations are free.
SAM.gov Registration
You must have an active account with SAM.gov, the System for Award Management (SAM). This includes having a Unique Entity Identifier (UEI).
- What is it? SAM is a federal procurement database. All entities that want to do business with the federal government MUST be registered in SAM.
- Existing SAM registrations must be updated annually.
- Duration to complete: can take several weeks.
- Registration Link: https://sam.gov/content/home
- Note: Subrecipients are not required to obtain an active SAM registration but must obtain a Unique Entity Identifier.
- HELP: https://sam.gov/content/help
Applicants must allow several weeks for the SAM process to complete. All registrations rely on completion of the SAM registration. (START Early)
Unique Entity Identifier (UEI)
- What is it? UEI is a non-proprietary identifier that has replaced the Federal Government use of Data Universal Numbering System (DUNS) number effective April 4, 2022.
- Applicants must obtain an UEI from the SAM to uniquely identify the entity. The UEI is available in the SAM entity registration record.
- Note: Subawardees/subrecipients at all tiers must also obtain an UEI from the SAM and provide the UEI to the recipient before the subaward can be issued.
- Duration to complete: can take several weeks.
- Registration Link: https://sam.gov/content/entity-registration
- HELP: https://www.fsd.gov/gsafsd_sp
Grants.gov Registration
You must have an active Grants.gov registration to receive automatic updates when modifications to this NOFO are posted. Doing so requires a Login.gov registration as well.
- What is it? Website used to enable federal grant-making agencies to notify potential applicants of funding opportunities. Please note that letters of intent, concept papers, and applications will not be accepted through Grants.gov (see eXCHANGE information below).
- Step-by step instructions for applicants at https://www.grants.gov/applicants/grant-applications/how-to-apply-for-grants
- Duration to complete: can take several days.
- Registration Link: https://grants.gov
- HELP: https://apply07.grants.gov/help/html/help/index.htm#t=GetStarted%2FGetStarted.htm
NEUP.gov
Register and create an account at www.NEUP.gov. Electronic applications and instructions are available at the NEUP.gov website. To access these materials:
- go to www.NEUP.gov;
- select “Sign In” from the top right-hand corner of the screen;
- enter your user credentials;
- select “Applications” from the menu; and
- click on “Create New Application” for the type of application you are creating.
If you have any questions about NEUP site registration, application processes, eligibility, or application document requirements contact the Innovative Nuclear Research (INR) Integration Office at NEUP@inl.gov.
DISCLAIMER:
Applicants are discouraged from submitting information considered proprietary unless it is deemed essential for proper evaluation of the application. If the application contains information that the applicant organization considers to be trade secrets, information that is commercial or financial, or information that is privileged or confidential, the pages containing that information should be identified as specified in the application instructions. When such information is included in the application, it is furnished to the federal government in confidence, with the understanding that the information will be used or disclosed only for evaluation of the application.
The information contained in the application will be protected by DOE from unauthorized disclosure, consistent with the need for merit review of applications of financial assistance awards to assure the integrity of the competitive process and the accuracy and completeness of the information. If a federal financial assistance award is made as a result of or in connection with an application, the federal government has the right to use or disclose the information to the extent authorized by law. This restriction does not limit the federal government’s right to use the information if it is obtained without restriction from another source
II. ELIGIBILITY
Please refer to the NOFO Part 1, Eligibility for the eligibility criteria specific to your application. This section includes additional information to help applicants understand the standard eligibility requirements across all DOE NOFOs.
A. Cost Sharing
This section contains additional information to help applicants understand federal cost sharing requirements. Please refer to the NOFO Part 1, Eligibility—Cost Sharing for the cost sharing criteria specific to your application.
1. Legal Responsibility
Although the cost share requirement applies to the entire project, including work performed by members of the project team other than the recipient, the recipient is legally responsible for paying the entire cost share. The recipient’s cost share obligation is expressed in the Assistance Agreement as a static amount in U.S. dollars (cost share amount) and as a percentage of the Total Project Cost (cost share percentage). If the funding agreement is terminated prior to the end of the project period, the recipient is required to contribute at least the cost share percentage of total expenditures incurred through the date of termination.
The recipient is solely responsible for managing cost share contributions by the project team and enforcing cost share obligation assumed by project team members in subawards or related agreements.
2. Cost Share Allocation
Each project team is free to determine how best to allocate the cost share requirement among the team members. The amount contributed by individual project team members may vary, as long as the cost share requirement for the entire project is met.
3. Cost Share Types and Allowability
Cost share must meet requirements set forth in 2 C.F.R. §§ 200.306 and 910.130, and cost principles set forth in 2 C.F.R. §§ 200.400-476 and 2 C.F.R. §§ 910.352. In addition, cost share must be verifiable upon submission of the full application. Cost share may be provided in the form of cash or cash equivalents, or in-kind contributions. Cost share must come from non-federal sources (unless otherwise allowed by law), such as project participants, state or local governments, or other third-party financing. DOE Loan Guarantees cannot be leveraged by applicants to provide the required cost share or otherwise support the same scope that is proposed under a project.
Cost share may be provided by the recipient, subrecipients, or third parties (entities that do not have a role in performing the scope of work). Vendors/contractors may not provide cost share. Any partial donation of goods or services is considered a discount and is not allowable.
Cash contributions include but are not limited to personnel costs, fringe costs, supply and equipment costs, indirect costs, and other direct costs.
In-kind contributions are those where a value of the contribution can be readily determined, verified, and justified but where no actual cash is transacted in securing the good or service comprising the contribution. Allowable in-kind contributions include but are not limited to the donation of volunteer time or the donation of space or use of equipment.
Project teams may use funding or property received from state or local governments to meet the cost share requirement, so long as the federal government did not provide the funding to the state or local government.
Cost share contributions must be specified in the project budget, verifiable from the recipient’s records, and necessary and reasonable for proper and efficient accomplishment of the project. As all sources of cost share are considered part of total project cost, DOE will review the cost share dollars according to the same federal regulations as federal dollars to the project. Every cost share contribution must be reviewed and approved in advance by the Grants Officer and incorporated into the project budget before the expenditures are incurred.
4. Unallowable Cost Share Sources
The recipient and subrecipient(s) may not use the following sources to meet cost share obligations:
- Cost share derived from federal sources (unless otherwise authorized by law).
- Cost share that does not meet:
- Requirements set forth in 2 C.F.R. §§ 200.306 and 910.130;
- Cost principles set forth in 2 C.F.R. §§ 200.400-476 and 2 C.F.R. §§ 910.352;
- For State Energy Programs, refer to 10 C.F.R. §§ 420.
- Cost share derived from the DOE loan program.
- Revenues or royalties from the prospective operation of an activity beyond the project period;
- Proceeds from the prospective sale of an asset of an activity;
- Federal funding or property (e.g., federal grants, equipment owned by the federal government);
- Expenditures that were reimbursed under a separate federal program.
- Cash or in-kind contributions used to meet cost share requirements for another federal project or program;
- Existing data as an in-kind contribution (e.g., data owned by an entity, that is not routinely sold commercially but is instead donated to the project and assigned a value);
- In general, deferred or avoided costs such as unrealized tax credits; or
- If applicable, other items as identified by DOE Programs and as specified in the applicable NOFO Part 1, Eligibility—Cost Sharing.
5. Cost Share Contributions by FFRDCs
Because FFRDCs are funded by the Federal Government, costs incurred by FFRDCs generally may not be used to meet the cost share requirement. FFRDCs may contribute cost share only if the contributions are paid directly from the contractor’s Management Fee or another non-federal source.
6. Cost Share Verification
Applicants are required to provide written assurance of their proposed cost share contributions in their applications. If selected for award negotiations, applicants are required to provide additional information and documentation regarding their cost share contributions. Please refer to the NOFO Part 1, Eligibility—Cost Sharing for specific requirements.
7. Cost Share Calculation Examples
Cost sharing is calculated as a percentage of the Total Project Cost. FFRDC costs must be included in Total Project Costs.
Example 1, Standard Cost Share Calculation
The following is an example of how to calculate cost sharing amounts for a project with $1 million in federal funds with a minimum 20% non-federal cost sharing requirement:
- Formula: Federal share ($) divided by federal share (%) = Total Project Cost
Example: $1,000,000 divided by 80% = $1,250,000 - Formula: Total Project Cost ($) minus federal share ($) = Non-federal share ($)
Example: $1,250,000 minus $1,000,000 = $250,000 - Formula: Non-federal share ($) divided by Total Project Cost ($) = Non-federal share (%)
Example: $250,000 divided by $1,250,000 = 20%
Example 2, Blended Cost Share Calculation
The following example shows the math for calculating required cost share for a project with $2 million in federal funds, with four tasks requiring different non-federal cost share percentages:
| Task | Proposed Federal Share | Federal Share % | Recipient Share % |
|---|---|---|---|
| Task 1 (R&D) | $1,000,000 | 80% | 20% |
| Task 2 (R&D) | $500,000 | 80% | 20% |
| Task 3 (Demonstration) | $400,000 | 50% | 50% |
| Task 4 (Outreach) | $100,000 | 100% | 0% |
Federal share ($) divided by federal share (%) = Task Cost
Each task must be calculated individually as follows:
Task 1
- $1,000,000 divided by 80% = $1,250,000 (Task 1 Cost)
- Task 1 Cost minus federal share = non-federal share
- $1,250,000 - $1,000,000 = $250,000 (non-federal share)
Task 2
- $500,000 divided 80% = $625,000 (Task 2 Cost)
- Task 2 Cost minus federal share = non-federal share
- $625,000 - $500,000 = $125,000 (non-federal share)
Task 3
- $400,000 / 50% = $800,000 (Task 3 Cost)
- Task 3 Cost minus federal share = non-federal share
- $800,000 - $400,000 = $400,000 (non-federal share)
Task 4
- Federal share = $100,000
- Non-federal cost share is not mandated for outreach = $0 (non-federal share)
The calculation may then be completed as follows:
| Tasks | $ Federal Share | % Federal Share | $ Non-Federal Share | % Non-Federal Share | Total Project Cost |
|---|---|---|---|---|---|
| Task 1 | $1,000,000 | 80% | $250,000 | 20% | $1,250,000 |
| Task 2 | $500,000 | 80% | $125,000 | 20% | $625,000 |
| Task 3 | $400,000 | 50% | $400,000 | 50% | $800,000 |
| Task 4 | $100,000 | 100% | $0 | 0% | $100,000 |
| Totals | $2,000,000 | $775,000 | $2,775,000 |
Blended Cost Share %
- Non-federal share ($775,000) divided by Total Project Cost ($2,775,000) = 27.9% (non-federal)
- Federal share ($2,000,000) divided by Total Project Cost ($2,775,000) = 72.1% (federal)
Example 3, Cost Share with Matching for Topic Area 2: General Scientific Infrastructure (GSI) Support
To maximize the use of available NE funding, cost matching is required on a 1:1 dollar match for requested amounts greater than $250,000 for applications under the GSI area. A general explanation of cost matching is located in Part VIII - G. For example, if a $300,000 project is proposed, cost matching requirements apply to $50,000 of this amount (the amount over $250,000), and the recipient would be required to contribute $25,000. This requirement may not be waived. There is no cost matching requirement for University Research RU Infrastructure Support Awards.
For cost match, applicants may include the following costs as allowable in accordance with the applicable cost principles:
a. Cash;
b. Personnel costs;
c. The value of a service, other resource, or third-party in-kind contribution determined in accordance with Subpart E—Cost Principles—of 2 CFR Part 200. For recipients that are for-profit organizations as defined by 2 CFR 910.122, the Cost Principles which apply are contained in 48 CFR Part 31 Subpart 31.2. See § 910.352 for further information.
- [NOTE: In-kind contributions, like any other cost, need to be incurred during the award project period (e.g., DOE cannot give credit for costs incurred prior to the award, including prior development costs, unless otherwise authorized by the applicable cost principles)];
d. Indirect costs or facilities and administrative costs; and
e. Any funds received under the power program of the Tennessee Valley Authority (except to the extent that such funds are made available under an annual appropriation act).
Applicants shall not include:
a. Revenues or royalties from the prospective operation of an activity beyond the time considered in the award;
b. Proceeds from the prospective sale of an asset of an activity; and
c. Other appropriated Federal funds.
B. Other Eligibility Information
Refer to NOFO Part 1, Eligibility—Eligible Applicants for NOFO-specific eligibility information. The information below is standard for DOE NOFOs.
1. Questions Regarding Eligibility
DOE will not make eligibility determinations for potential applicants prior to the date on which applications to the NOFO Part 1 must be submitted. The decision to apply in response to the NOFO Part 1 lies solely with the applicant.
2. Entity of Concern Prohibition
Prohibition
No Entity of Concern as defined in Section 10114 of Public Law 117-167 (42 USC 18912), may receive any grant, contract, cooperative agreement, or loan of $10 million or more in Department of Energy funds, including funds made available by the Consolidated Appropriations Act, 2024 (Public Law 118-42).
In addition, for all awards involving Departmental activities authorized under Public Law 117-167, no Entity of Concern (including an individual that owns or controls, is owned or controlled by, or is under common ownership or control with an Entity of Concern) may receive DOE funds or perform work under any award, subject to certain penalties. See Section 10114 of Public Law 117-167 (42 USC 18912) and Division D, Title III, Section 310 of Division D of the Consolidated Appropriations Act of 2024 (Pub. L. No. 118-42) for additional information.
By submitting an application to this NOFO, the applicant is certifying that neither the applicant nor any of the project participants qualify as Entities of Concern.
Definitions
Entity of Concern is defined as in section 10114 of Public Law 117-167 (42 USC 18912), also known as the CHIPS and Science Act, as any entity, including a national, that is—
- (A) identified under section 1237(b) of the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999 (50 U.S.C. 1701 note; Public Law 105–261);
- (B) identified under section 1260H of the William M. (Mac) Thornberry National Defense Authorization Act for Fiscal Year 2021 (10 U.S.C. 113 note; Public Law 116–283);
- (C) on the Entity List maintained by the Bureau of Industry and Security of the Department of Commerce and set forth in Supplement No. 4 to part 744 of title 15, Code of Federal Regulations;
- (D) included in the list required by section 9(b)(3) of the Uyghur Human Rights Policy Act of 2020 (Public Law 116–145; 134 Stat. 656); or
- (E) identified by the Secretary, in coordination with the Director of the Office of Intelligence and Counterintelligence and the applicable office that would provide, or is providing, covered support, as posing an unmanageable threat—
- (i) to the national security of the United States (U.S.); or
- (ii) of theft or loss of U.S. intellectual property.
3. Artificial Intelligence (AI) Application Use
Any use of artificial intelligence in the creation of any part of an application for this NOFO must be appropriately attributed. Even with the use of artificial intelligence, each applicant is responsible for and is representing to the U.S. Government that the information in its application documents is accurate, that the applicant is fully capable of performing the work described in the application, and that the submission of the application does not and will not infringe or violate any rights of any third party or entity.
III. PROGRAM DESCRIPTION
Refer to NOFO Part 1, Program Description for all information related to the specific NOFO goals, objectives, and topic areas, if any.
A. Informational Webinar
Refer to the NOFO Part 1, Basic Information—Key Dates to determine if DOE plans to conduct an informational webinar while the NOFO is open.
If applicable, DOE will conduct an informational webinar during the NOFO process. It will be held after the initial NOFO release but before the due date for concept papers or the application if concept papers are not required.
Attendance is not mandatory and will not positively or negatively impact the overall review of any applicant submissions. The webinar will be open to all potential applicants who wish to participate. Applicants should refrain from asking questions or communicating information that would reveal confidential and/or proprietary information specific to their project.
The rest of this page is intentionally left blank.
IV. APPLICATION CONTENT AND FORM
This section contains supplemental information to help applicants understand the application content and form requirements outlined in the NOFO including detailed information on the content and naming conventions of the application content. Please refer to the NOFO Part 1, Application Content and Form section for the application contents and form specific to your application.
Note that some of the required application elements below have separate requirements for Research and Development (R&D) versus non-R&D NOFOs. Refer to the NOFO Part 1, Application Content Requirements section for specific instructions.
A. Application Format Summary
All submissions must conform to the form and content requirements described below. Refer to the NOFO Part 1, Application Content and Form for the page limits.
Format Requirements
| Parameter | Requirement |
|---|---|
| File Format | Portable Document Format (PDF) unless stated otherwise. |
| Language | English |
| Paper Size | 8.5" x 11" |
| Margins | Not less than 1" (>= 1") on every side. |
| Font | Calibri typeface, a black font color, and a font size of 11-point or larger (except in figures or tables, which may be 10-point font). A symbol font may be used to insert Greek letters or special characters, but the font size requirement still applies. |
| References | References must be included as footnotes or endnotes in a font size of 10 or larger. Footnotes and endnotes are counted toward the maximum page requirement. |
| Tracking ID Number | A tracking ID number will be assigned to the application once an applicant begins the application process and saves the application. Once saved, the tracking ID number will be generated at the bottom of the application. The tracking ID number must be included with all application documents. Specifically, the control number must be prominently displayed on the upper right corner of the header of every page and included in the file name (i.e., Tracking ID Number_Applicant Name_Application). |
| Page Numbers | Page numbers must be included in the footer of every page. |
| Page Limit | Each submission must not exceed the specified maximum page limit, including cover page, charts, graphs, maps, and photographs when printed using the formatting requirements set forth above and single spaced. |
| Page Count Limitations | If applicants exceed the maximum page limitations, DOE will review only the authorized number of pages and disregard any additional pages. |
The following information is intended to address issues typically encountered during the application process. If you have any questions about NEUP.gov site registration, or require technical assistance, contact the Nuclear Energy External Innovation Integration Office at NEUP@inl.gov.
Additional Application Information
- Deadlines for Submission: NEUP.gov is designed to enforce the deadlines specified in this NOFO. The “Save” and “Submit” buttons will automatically disable at the defined submission deadlines.
- Submission Difficulties: Applicants who experience technical difficulties with submission PRIOR to the NOFO deadline should contact NEUP@inl.gov for assistance.
- Application Forms: To access application forms and instructions available on NEUP.gov, select the appropriate call under “My Applications.”
- Size Limitations: The maximum file size that can be uploaded to NEUP.gov is 100MB. Files larger than 100MB cannot be uploaded and hence cannot be submitted for review. If a file is larger than 100MB but is still within the maximum page limit specified in the NOFO, it must be broken into parts and denoted to that effect. For example: "TechnicalVolume_Part_1", "TechnicalVolume_Part_2".
- DOE will not accept late submissions that resulted from technical difficulties due to uploading files that exceed 100MB.
B. Application Content Requirements
The NOFO Part 1, Application Content Requirements identifies which of the following application documents are required including the program-specific requirements such as the technical volume and specified page limits. Each application must be limited to a single concept and must not exceed the stated page limits.
DOE provides detailed guidance on the content and form of each component below.
1. Conflict of Interest (COI) Acknowledgement
The DOE interim Conflict of Interest Policy for Financial Assistance (COI Policy) can be found at https://www.energy.gov/management/department-energy-interim-conflict-interest-policy-requirements-financial-assistance. This policy is applicable to all non-Federal entities applying for, or that receive, DOE funding by means of a financial assistance award (e.g., a grant, cooperative agreement, or technology investment agreement) and, through the implementation of this policy by the entity, to each Investigator who is planning on participating in, or is participating in, the project funded wholly or in part under the DOE financial assistance award. DOE’s interim COI Policy establishes standards that provide a reasonable expectation that the design, conduct, and reporting of projects funded wholly or in part under DOE financial assistance awards will be free from bias resulting from financial conflicts of interest or organizational conflicts of interest. The applicant is subject to the requirements of the interim COI Policy and within each application for financial assistance, the applicant must certify that it is, or will be by the time of receiving any financial assistance award, compliant with all requirements in the interim COI Policy. The applicant must flow down the requirements of the interim COI Policy to any subrecipient non-Federal entities.
The applicant is required to disclose, manage, and report conflicts of interest as per the DOE interim COI Policy. Check the appropriate box on the application form certifying compliance with the COI Policy. If any disclosures need to be made, upload a COI document to the COI disclosure area of the application form.
Save file as: FY26 COI [TRACKING ID#].pdf
2. Application for Federal Assistance (SF-424)
Applicants must complete the SF-424, Application for Federal Assistance, which is available here, (https://neup.inl.gov/content/uploads/14/2024/07/SF424_4_0-V4.0-16.pdf. Complete all required fields in accordance with the instructions on the form. The System for Award Management (SAM) is the central repository for common government-wide certifications and representations required of Federal grants recipients. As registration in SAM is required for eligibility for a federal award and registration must be updated annually, Federal agencies use SAM information to comply with award requirements and avoid increased burden and costs of separate requests for such information, unless the recipient fails to meet a federal award requirement, or there is a need to make updates to their SAM registration for other purposes.
Please ensure that the dates (Block 17) and dollar amounts (Block 18) on the SF-424 are for the complete project period and not just the first project year, first phase, or another subset of the project period.
Save file as: FY26 SF424 [TRACKING ID#].pdf
3. Project/Performance Site Location(s)
Insert the primary site where the work will be performed. If a portion of the project will be performed at any other site(s), identify the site location(s) in the blocks provided.
NOTE: The Project/Performance Site Congressional District is entered in the format of the two-digit state code followed by a dash and a three-digit Congressional district code (i.e., VA-001). Hover over the field in the form for additional instructions.
Use the “Next Site” button to expand the form to add additional Project/Performance Site Locations.
Save file as: FY26 Site Location [TRACKING ID#].pdf
4. Project Summary/Abstract File
The one (1) page project summary/abstract must contain a summary of the proposed activity suitable for dissemination to the public. It should be a self-contained document that identifies the applicant’s name, names of major participants, the project title, the objectives of the project, and a description of the project, including methods to be employed, the potential impact of the project (i.e., benefits, outcomes), and major participants (for collaborative projects). Do not include any proprietary or sensitive business information in this document, because, if an award is made, the Department may make it available to the public. The required template can be found here: https://neup.inl.gov/content/uploads/14/2024/07/Infrastructure-Abstract-Template-1.docx.
Summary of Public Release Content
- Applicant Name: Provide the legal name of the applicant.
- Major Participant Names: List all significant project participants and their roles.
- Lead Project Manager / Principal Investigator(s): Provide names and titles.
- Project Title: Provide the title for the planned project.
- Project Objectives: Identify the overarching project objectives aligned with requirements set forth in the NOFO.
- Project Description: The description must include methods to be employed, the potential impact of the project (e.g., benefits, outcomes).
- Publicly Releasable (Unlimited Rights): This document must not include any proprietary or business-sensitive information, as DOE may make it available to the public after selections are made.
- Page Limit Clarification: The summary must not exceed the stated page limit when printed, using standard 8.5” x 11” paper with 1” margins (top, bottom, left, and right) with font not smaller than 12-point.
Save template as: FY26 Abstract [TRACKING ID#].pdf
5. Project Summary Slide
The one (1) slide project summary file must contain the following information: a graphical summary to illustrate the proposed activities, a one sentence project summary, list of key project goals and a summary of the project impact. The summary slide should be a self-contained document that also clearly identifies the name of the prime applicant, the project director/principal investigator(s), the project title, partner and participating institutions, project period, and the budget request and cost-share (if applicable). Do not include any proprietary or sensitive business information in this document, because, if an award is made, the Department may make it available to the public.
Summary Slide Content
- Project Title: Provide the title for the planned project.
- Prime Applicant: Provide the legal name of the applicant.
- PI/LPM and Key Personnel Information: Provide names and titles.
- Requested DOE Funds: Identify Federal funds requested for the project.
- Proposed Cost Share: Provide the amount of cost share contribution.
- Technology Summary: Describe the technology to be developed.
- Technology Impact: Describe the impact of the proposed technology if the project is successful.
- Project Goals: Identify the overarching project goals.
- Key Graphics: Illustrations, charts and/or tables.
- Key Idea / Takeaway: Describe the key takeaway that you would like to provide to the DOE.
Save file as: FY26 Summary Slide [TRACKING ID#].pdf
6. Resume
A curriculum vitae or resume provides information reviewers can use to evaluate an individual’s skills, experience, and potential for leadership within the scientific community. Applicants must submit a resume or biographical sketch (see description below the table) for each Principal Investigator or Lead Project Manager, Senior/Key Personnel, and all covered individuals as defined in the NOFO Part 1, Application Content and Form—Application Content Requirements, Covered Individual Definition, Designation and Responsibility.
DOE reserves the right to not proceed with merit reviews for incomplete applications. Applicants must screen resumes to ensure that they do not contain Personal Identifiable Information (PII) such as personal addresses, personal landline/cell phone numbers, and personal emails.
Resumes must include the following information, at a minimum:
Curriculum Vitae / Resume Requirements
- Page Limit: 3 page limit.
- Contact Information: Phone, email, and address associated with the applicant at their respective organization. Do not include PII.
- Education & Training: Provide name of institution, major/area, degree, and year for undergraduate, graduate, and postdoctoral training.
- Research & Professional Experience: Beginning with the current position, list professional/academic positions in chronological order with a brief description. List all current academic, professional, or institutional appointments, foreign or domestic, at the applicant institution or elsewhere, whether remuneration is received, and, whether full-time, part-time, or voluntary.
- Awards & Honors: List any notable awards and honors received.
- Publications: List of up to 10 publications most closely related to the proposed project. For each publication, identify the names of all authors (in the same sequence in which they appear in the publication), the article title, book or journal title, volume number, page numbers, year of publication, and website address if available electronically. Patents, copyrights, and software systems developed may be provided in addition to or substituted for publications. An abbreviated style such as the Physical Review Letters (PRL) convention for citations (list only the first author) may be used for publications with more than 10 authors.
- Synergistic Activities: List up to five professional and scholarly activities related to the proposed effort.
- Additional Criteria: There should be no lapses in time over the past 10 years or since age 18, whichever period is shorter.
As an alternative to a resume, it is acceptable to use the biographical sketch format approved by the National Science Foundation (NSF). The biographical sketch format may be generated by the Science Experts Network Curriculum Vita (SciENcv), a cooperative venture maintained at https://www.ncbi.nlm.nih.gov/sciencv/, and is also available at https://new.nsf.gov/policies/pappg/24-1/ch-2-proposal-preparation#ch2D2hi. The use of a format required by another agency is intended to reduce the administrative burden to researchers by promoting the use of common formats.
Save individual resumes as: FY26 Resume [LAST NAME] [TRACKING ID#].pdf
7. Budget Information Non-Construction Programs (SF-424A)
Applicants must provide a separate budget for each year of support requested and a cumulative budget for the total project period of performance. Use the SF 424A Form, “Budget Information – Non-Construction Programs” form on the DOE Financial Assistance Forms page at https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients. Alternatively, the direct link to the form is located here: https://www.energy.gov/management/articles/sf-424-budget-information-non-construction-programs
Applicants may request funds under any of the Object Class Categories as long as the item and amount are necessary to perform the proposed work, meet all the criteria for allowability under the applicable Federal cost principles, and are not prohibited by the funding restrictions outlined in the NOFO Part 1, Application Content and Form—Funding Restrictions.
Save file as: FY26 SF424A [TRACKING ID#].xlsx
8. Cost Sharing Letter(s) of Commitment
Submit letters of commitment from all third-party cost share providers (i.e., a party other than the organization submitting the application). The letter must state that the third party is committed to providing a specific minimum dollar amount of cost sharing or in-kind contributions allocated to cost sharing. Submitting signed letters with the application provides assurance that the commitments have been agreed upon. Letters of support or endorsement for the project from entities that do not have a substantive role in the project will not be accepted.
Letters of Commitment Content
- Organization Name: Phone, email, and address.
- Proposed Dollar Amount to be Provided: Value of the contribution and percentage of the total project costs.
- Cost Sharing Type: Cash or In-Kind contribution (or both).
Each letter must not exceed one page.
Save file as: FY26 Letters [Organization] [TRACKING ID#].pdf
9. Budget Justification
Applicants are required to provide a detailed budget justification for the project as a whole, including all work to be performed by the Applicant and its Subrecipients and Contractors, and provide all requested documentation (e.g., a federally-approved rate agreement, contractor quotes). Applicants should include costs associated with the Buy America Requirements for Infrastructure projects required annual audits and incurred cost proposals in their proposed budget documents. Such costs may be reimbursed as direct or indirect costs.
The budget justification detailed requirement instructions are available at NEUP.gov (https://neup.inl.gov/content/uploads/14/2024/07/Budget-Justification-FINAL_Rev2.pdf). Although the data requested is required, the use of the budget justification workbook is not.
Applicants must justify the costs proposed in each Object Class Category/Cost Classification category. Provide an equipment list with the following information:
- Clearly identified equipment (e.g., description, manufacturer part number, etc., if known);
- Explain how the proposed equipment meets the definition of “equipment” at 2 CFR 200.33, as opposed to items of supply;
- Explain the need for the equipment to accomplish the project;
- Indicate the unit cost and quantity for each item to be purchased; and
- Explain how the cost estimates for equipment purchases are established, are determined to be fair and reasonable, and are consistent with applicant institution’s established procurement procedures (compliant with 2 CFR 200.17-200.326). Include available supporting documents such as quotes or catalog pricing for the proposed equipment.
If cost sharing is proposed, provide an explanation of the source, nature, amount, and availability.
(1) the name of the organization;
(2) the proposed dollar amount to be provided;
(3) the amount as a percentage of the total project cost; and
(4) the proposed cost sharing - cash, services, or property.
Funding restrictions for this NOFO:
- The application cannot include hiring or other human capital costs;
- Indirect costs are not allowed; the application cannot include the cost of routine operation and maintenance of equipment;
- Installation costs for equipment and instrumentation that are beyond the vendor’s standard installation cost are not allowed;
- Institution-specific costs, not specific to the equipment or instrumentation, are the responsibility of the applicant. For example, if a vendor needs to meet safety and health requirements to access the campus or a facility, these costs are the responsibility of the applicant;
- Funds are restricted to equipment for activities supporting research, teaching, and education; and
- Upgrades to increase operational profit or support for commercial activities are not allowed.
Foreign travel is not allowed for awards made under this NOFO. Any foreign travel added to the budget justification will not be approved upon issuance of the grant.
DOE understands that projects selected under this NOFO may require the use of existing data. For purposes of this NOFO, DOE will consider data that is commercially available at an established price to be an allowable cost under the project (either as DOE share or non-federal cost share), but DOE will not consider in-kind data (e.g., data, owned by an entity, that is not routinely sold commercially but is instead donated to the project and assigned a value) to be an allowable cost under the project, including as Recipient cost share. Estimation methods used by the Recipient to assign a value to in-kind data cannot be objectively verified by DOE and therefore will not be accepted by DOE as an allowable cost under any project selected from this NOFO. Consequently, DOE will not recognize in-kind data costs in any resulting approved DOE budget.
Save file as: FY26 Budget Justification [TRACKING ID#].xlsx
10. Vendor Quotes
Submit vendor quotes, referenced costs (e.g., catalog pricing), or other basis for estimate for any single item over $10,000. This is required even though the proposer may intend to submit the contract for open bids following award. Save vendor quotes in one single file.
Save file as: FY26 Vendor Quotes [Tracking ID#].pdf
11. Current and Pending Support
Current and pending support is intended to allow the identification of potential duplication, overcommitment, potential conflicts of interest or commitment, and all other sources of support. As part of the application, the Principal Investigator or Lead Project Manager and all covered individuals as defined in the NOFO Part 1, Application Content Requirements—Covered Individual Definition, Designation, and Responsibility at the applicant and subrecipient level. Consistent with the chart below, the current and pending support disclosures and biosketch/resumes must together include a list of all sponsored activities, awards, and appointments, whether paid or unpaid; provided as a gift with terms or conditions or provided as a gift without terms or conditions; full-time, part-time, or voluntary; faculty, visiting, adjunct, or honorary; cash or in-kind; foreign or domestic; governmental or private-sector; directly supporting the individual’s research or indirectly supporting the individual by supporting students, research staff, space, equipment, or other research expenses. All connections with malign foreign talent recruitment programs must be identified in current and pending support.
Information Required for Each Activity
- Sponsor of the Activity: The sponsor of the activity or the source of funding. Identify the entity for each proposal and/or active project that is providing the support. Include all Federal, State, Tribal, territorial, local, foreign, public or private foundations, non-profit organizations, industrial or other commercial organizations, or internal funds allocated toward specific projects.
- Award Number: The federal award number or any other identifying number.
- Award Title: The title of the award or activity. If the title of the award or activity is not descriptive, add a brief description of the research being performed that would identify any overlaps or synergies with the proposed research.
- Total Cost or ValueTotal Cost or Value: The total cost or value of the award or activity, including direct and indirect costs and cost share. For pending proposals, provide the total amount of requested funding. For in-kind contributions, enter the US dollar value of the in-kind contribution with an estimated value of $5000 or more. If the dollar value is not readily ascertainable, a reasonable estimate should be provided. If the support is in a foreign country’s currency, convert to US dollars at time of submission rounded to the nearest dollar.
- Primary Place of Performance: Identify the primary location where the proposal and/or active project is being executed. Enter the City, State/Province, and Country where the organization is located. If the State/Province is not applicable, state N/A.
- Award Period: The "Start Date" through "End Date."
- Person-months: The person-months of effort per year dedicated to the award or activity. Enter how much time the individual anticipates is necessary to complete the scope of work on the proposal and/or active project. Enter the number of person-months (even if unsalaried) for the current budget period and enter the proposed person-months for each subsequent budget period. If the time commitment is not readily ascertainable, a reasonable estimate should be provided.
- Overall Objectives: Provide a brief statement of the overall objectives of the proposal/active project.
- Statement of Potential Overlap: Enter a description of the potential overlap with any pending proposal or active foreign or domestic project and this proposal in terms of scope, budget, or person-months planned or devoted to the project by the individual. If there is no potential overlap, state “none.”
- Digital Persistent Identifier (e.g., ORCID iD): For R&D NOFOs only, providing an ORCID iD is required.
- Certification Statement: All covered individuals must provide a separate disclosure statement listing the required information above regarding current and pending support. Each individual must sign and date their respective certification statement:
I, [Full Name and Title], understand that I have been designated as a covered individual by the Federal funding agency.
I certify to the best of my knowledge and belief that the information contained in this Current and Pending Support Disclosure Statement is true, complete, and accurate. I understand that any false, fictitious, or fraudulent information, misrepresentations, half-truths, or omissions of any material fact, may subject me to criminal, civil, or administrative penalties for fraud, false statements, false claims, or otherwise. (18 U.S.C. §§ 1001 and 287, and 31 U.S.C. §§ 3729-3733 and 3801-3812). I further understand and agree that (1) the statements and representations made herein are material to DOE’s funding decision, and (2) I have a responsibility to update the disclosures during the period of performance of the award should circumstances change which impact the responses provided above.
I also certify that, at the time of submission, I am not a party in a malign foreign talent recruitment program. I further understand should I take action to involve myself with a Malign Foreign Talent Recruitment Program during the period of performance of the award, I must notify the recipient’s Authorized Agent immediately, but no later than five business days of taking such action and immediately recuse myself from all DOE awards.
The following certification is required for R&D projects:
I further certify that within the past 12 months I have completed research security training meeting the requirements in SEC. 10634(b) of 42 USC 19234.
Foreign Government Sponsorship
Details of any obligations, contractual or otherwise, to any program, entity, or organization sponsored by a foreign government must be provided on request to either the applicant institution or DOE. Supporting documents of any identified source of support must be provided to DOE on request, including certified translations of any document.
The information may be provided in the Common Form for Current and Pending (Other) Support. Regardless of the format used, the individual must include a signature, date, and a certification statement using the language included in the table above.
Current and Pending Support Disclosures must be submitted for all covered individuals, include the exact certification statement provided above, and must be signed and dated in order to be considered.
Definitions:
- Current and pending support –
A) All resources made available, or expected to be made available, to an individual in support of the individual’s RD&D efforts, regardless of
i. whether the source is foreign or domestic;
ii. whether the resource is made available through the entity applying for an award or directly to the individual; or
iii. whether the resource has monetary value; and
B) includes in-kind contributions requiring a commitment of time and directly supporting the individual’s RD&D efforts, such as the provision of office or laboratory space, equipment, supplies, employees, or students.
This term has the same meaning as the term “Other Support” as applied to researchers in NSPM-33: For researchers, Other Support includes all resources made available to a researcher in support of and/or related to all of their professional RD&D efforts, including resources provided directly to the individual or through the organization, and regardless of whether or not they have monetary value (e.g., even if the support received is only in-kind, such as office/laboratory space, equipment, supplies, or employees). This includes resource and/or financial support from all foreign and domestic entities, including but not limited to gifts provided with terms or conditions, financial support for laboratory personnel, and participation of student and visiting researchers supported by other sources of funding.
Malign Foreign Talent Recruitment Program as defined in P.L. 117-167, Section 10638(4):
A) any program, position, or activity that includes compensation in the form of cash, in-kind compensation, including research funding, promised future compensation, complimentary foreign travel, things of non de minimis value, honorific titles, career advancement opportunities, or other types of remuneration or consideration directly provided by a foreign country at any level (national, provincial, or local) or their designee, or an entity based in, funded by, or affiliated with a foreign country, whether or not directly sponsored by the foreign country, to the targeted individual, whether directly or indirectly stated in the arrangement, contract, or other documentation at issue, in exchange for the individual—
i. engaging in the unauthorized transfer of intellectual property, materials, data products, or other nonpublic information owned by a U.S. entity or developed with a federal research and development award to the government of a foreign country or an entity based in, funded by, or affiliated with a foreign country regardless of whether that government or entity provided support for the development of the intellectual property, materials, or data products;
ii. being required to recruit trainees or researchers to enroll in such program, position, or activity;
iii. establishing a laboratory or company, accepting a faculty position, or undertaking any other employment or appointment in a foreign country or with an entity based in, funded by, or affiliated with a foreign country if such activities are in violation of the standard terms and conditions of a federal research and development award;
iv. being unable to terminate the foreign talent recruitment program contract or agreement except in extraordinary circumstances;
v. through funding or effort related to the foreign talent recruitment program, being limited in the capacity to carry out a research and development award or required to engage in work that would result in substantial overlap or duplication with a federal research and development award;
vi. being required to apply for and successfully receive funding from the sponsoring foreign government's funding agencies with the sponsoring foreign organization as the recipient;
vii. being required to omit acknowledgment of the recipient institution with which the individual is affiliated, or the federal research agency sponsoring the research and development award, contrary to the institutional policies or standard terms and conditions of the federal research and development award;
viii. being required to not disclose to the federal research agency or employing institution the participation of such individual in such program, position, or activity; or
ix. having a conflict of interest or conflict of commitment contrary to the standard terms and conditions of a federal research and development award; and
(B) a program that is sponsored by—
i. a foreign country of concern or an entity based in a foreign country of concern, whether or not directly sponsored by the foreign country of concern;
ii. an academic institution on the list developed under section 1286(c)(8) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1 Public Law 115–232); or
iii. a foreign talent recruitment program on the list developed under section 1286(c)(9) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1 Public Law 115–232).
More information can be found at Prohibition on Malign Foreign Talent Recruitment Program Participation.
Save file as: FY26 CPS [Tracking ID#].pdf
12. Potentially Duplicative Funding Notice
If the applicant or project team member has other active awards of federal funds, the applicant must determine whether the activities of those awards potentially overlap with the activities set forth in its application to this NOFO. If there is a potential overlap, the applicant must notify DOE in writing of the potential overlap and state how it will ensure any project funds (i.e., recipient cost share and federal funds) will not be used for identical cost items under multiple awards.
Likewise, for projects that receive funding under this NOFO, if a recipient or project team member receives any other award of federal funds for activities that potentially overlap with the activities funded under the DOE award, the recipient must promptly notify DOE in writing of the potential overlap and state whether project funds from any of those other federal awards have been, are being, or are to be used (in whole or in part) for one or more of the identical cost items under the DOE award. If there are identical cost items, the recipient must promptly notify the DOE Grants Officer in writing of the potential duplication and eliminate any inappropriate duplication of funding.
Save file as: FY26 PDFN [TRACKING ID#].pdf
13. Lobbying Activities
Recipients and subrecipients may not use any federal funds to influence or attempt to influence, directly or indirectly, congressional action on any legislative or appropriation matters. See also Lobbying in the Funding Restrictions section below.
a. All recipients and subrecipients that have lobbying activities to disclose:
Complete and submit the Disclosure of Lobbying Activities (SF-LLL) available at: https://apply07.grants.gov/apply/forms/sample/SFLLL_2_0-V2.0.pdf to ensure that non-federal funds have not been paid and will not be paid to any person for influencing or attempting to influence any of the following in connection with the application:
- An officer or employee of any federal agency;
- A Member of Congress;
- An officer or employee of Congress; or
- An employee of a Member of Congress.
b. Recipients and subrecipients that have no lobbying activities to disclose:
Complete and submit, Certification Regarding Lobbying form (OMB 4040-0013) available at: https://apply07.grants.gov/apply/forms/sample/GG_LobbyingForm-V1.1.pdf
Save file as: FY26 SF-LLL [TRACKING ID#].pdf
14. Transparency of Foreign Connections
Applicants must provide a transparency of foreign connections disclosure and certification as it relates to the proposed recipient and subrecipient(s). Include a separate disclosure for the applicant and each proposed subrecipient.
Disclosure Format: For the convenience of the entity providing the disclosure and certification a template is available at Transparency of Foreign Connections | Department of Energy, however, the entity is not required to use this specific format. If another format is used, the signatory must include the same substantive information, a signature, date, and the certification statement provided at Transparency of Foreign Connections | Department of Energy.
Disclosure exceptions by entity type:
- U.S. National Laboratories and domestic government entities are not required to respond to the Transparency of Foreign Connections disclosure.
- Institutions of higher education are only required to respond to items with an asterisk symbol (*).
- The applicability of disclosure requirements is determined by the entity type. Regardless of whether the applicant is exempt, the subrecipient(s) must provide these disclosures unless the subrecipient is also exempt.
Applicants, regardless of entity type, must provide complete responses for project team members that are not U.S. national laboratories, domestic government entities, or institutions of higher education.
Questions: Contact rtesinfo@hq.doe.gov
DOE reserves the right to request additional or clarifying information based on the information submitted.
Save file as: FY26 TFC [TRACKING ID#].pdf
15. Impacted Indian Tribes Documentation (if applicable)
For any application that potentially impacts Indian Tribes or is on Tribal land1 including when the potentially impacted Indian Tribe is the applicant, applicants are required to submit additional documentation at the time of application, and possibly during negotiation and prior to award. For any project that potentially impacts Indian Tribes, applicants are required to submit documentation demonstrating that an authorized representative of each potentially impacted Indian Tribe is, at a minimum, aware of the nature of the application and its potential impacts to the relevant Indian Tribes. The notified authorized representative2 must be holding their position while the award is open for applications, and documentation must demonstrate affirmative awareness of the application (e.g., a delivery record from certified mail, a reply by the authorized representative).
For any project intended to be sited on Tribal land(s) or known by the applicant to intersect with Tribal subsurface rights, applicants are required to submit documentation demonstrating support from the relevant Indian Tribes at the time of application. Documentation of support submitted at the time of application will also be considered.
Helpful Resources
| Item | Criteria |
|---|---|
| Letter of Support from Tribal Leadership | The letter must be signed by an authorized representative of the Indian Tribe. The signer(s) must be holding their position while the award is open for applications or negotiations. |
| Tribal Council Resolution, Board resolution (including the Board of Directors of an Alaska Native Corporation (ANC)), or similar act passed by the legislative body of the Tribal government or Board of Directors of an ANC | Must express support for the project. |
For projects not intended to be sited on Tribal land(s) or intersecting with Tribal subsurface rights, but that are known by the applicant to have potential impacts on Tribal resources or reserved rights, letters of support or resolutions of support are strongly encouraged and, depending on the nature of the impact, may be required if selected for negotiation of an agreement. Applicants are encouraged to reach out to Indian Tribes as early as possible in the application process to give Indian Tribes ample time to evaluate and respond.
The following resources may be useful to help determine if a project may impact an Indian Tribe(s) resources or reserved rights and the appropriate contacts. These resources are not exhaustive, and many Indian Tribes have resources or reserved rights which extend beyond their Tribal lands, or are covered within treaties, statutes, or case-law. Applicants are encouraged to do additional research:
| Item | Location |
|---|---|
| Map of Indian Lands | https://bia-geospatial-internal.geoplatform.gov/indianlands/ |
| Tribal Treaties Database | https://treaties.okstate.edu/ |
| Directory of federally recognized Tribes and Tribal leaders | https://www.bia.gov/service/tribal-leaders-directory |
| Best Practices for Identifying and Protecting Tribal Treaty Rights, Reserved Rights, and other similar rights in federal regulatory actions | https://www.bia.gov/sites/default/files/dup/inline-files/best_practices_guide.pdf |
Applicants are required to document any efforts taken to identify any potential impacts and proposed mitigation of these impact to Indian Tribes, Indian lands, Alaska Native regional and village land, traditional homelands, Tribal rights, or Tribal historic sites, or sacred sites. This includes any correspondence with Indian Tribes. These documents should be available on request to DOE. An applicant’s failure to submit documentation of an Indian Tribe’s awareness, or a letter of support, when required as described above, may constitute grounds for determining an application ineligible, non-responsive to the NOFO, not subject to further review, and/or not otherwise subject to selection or award.
Any application that may potentially impact Indian Tribe(s) may be shared with the potentially impacted Indian Tribe(s). Applicants should include a Notice of Restriction on Disclosure and Use of Data identifying any business sensitive, trade secrets, proprietary, or otherwise confidential information.
Such information shall be used or disclosed only for evaluation of the application or to determine whether the proposed project affects an Indian Tribe(s). If an applicant determines an Indian Tribe(s) will be impacted, the applicant must provide information on the project location, potential impacts and how the applicant will engage with Indian Tribe(s), during the period of performance of the agreement, and, if necessary, after the end of the agreement. If the applicant proposes any activities that could impact Tribal resources or reserved rights, including but not limited to lands, cultural sites, sacred sites, water rights, mineral rights, fishing rights, and hunting rights, they must notify DOE as outlined below in the application submission requirements. DOE will determine if formal government-to-government consultation is needed, and DOE will conduct that consultation accordingly, in addition to any engagement by applicant.
Save file as: FY26 Impacted Indian Tribes [TRACKING ID#].pdf
D. Funding Restrictions
Funding for all awards is contingent upon the availability of funds appropriated by Congress for the purpose of this program.
1. Allowable Costs
All expenditures must be allowable, allocable, and reasonable in accordance with the applicable federal cost principles. Pursuant to 2 CFR 910.352, the cost principles in the Federal Acquisition Regulations (48 CFR 31.2) apply to for-profit entities. The cost principles contained in 2 CFR Part 200, Subpart E apply to all entities other than for-profits.
2. Pre-Award Costs
Recipients may charge to an award resulting from this announcement, pre-award costs incurred within the ninety (90) calendar day period immediately preceding the effective date of the award, provided the costs are allowable in accordance with the applicable Federal cost principles referenced in 2 CFR part 200. Recipients must obtain the prior written approval of the CO for any pre-award costs that are for periods greater than this 90-day calendar period.
Pre-award costs are incurred at the applicant's risk. DOE is under no obligation to reimburse such costs if, for any reason, the applicant does not receive an award, or the award is made for a lesser amount than the applicant expected.
Pre-award costs cannot be incurred prior to the Selection Official signing the Selection Statement and Analysis.
Pre-award expenditures are made at the selectee’s risk. DOE is not obligated to reimburse costs: (1) in the absence of appropriations; (2) if an award is not made; or (3) if an award is made for a lesser amount than the selectee anticipated.
National Environmental Policy Act (NEPA) Requirements Related to Pre-Award Costs
DOE’s decision whether and how to distribute federal funds under this NOFO is subject to NEPA. Applicants should carefully consider and should seek legal counsel or other expert advice before taking any action related to the proposed project that would have an adverse effect on the environment or limit the choice of reasonable alternatives prior to DOE completing the NEPA review process.
DOE does not guarantee or assume any obligation to reimburse pre-award costs incurred prior to receiving written authorization from the Grants Officer or 90 days prior to award. If the applicant elects to undertake activities that DOE determines may have an adverse effect on the environment or limit the choice of reasonable alternatives prior to receiving such written authorization from the Grants Officer, the applicant is doing so at risk of not receiving federal funding for its project and such costs may not be recognized as allowable cost share. Nothing contained in the pre-award cost reimbursement regulations or any pre-award costs approval letter from the Grants Officer overrides the requirement to obtain the written authorization from the Grants Officer prior to taking any action that may have an adverse effect on the environment or limit the choice of reasonable alternatives. Likewise, if an application is selected for negotiation of award, and the recipient elects to undertake activities that are not authorized for federal funding by the Grants Officer in advance of DOE completing a NEPA review, the recipient is doing so at risk of not receiving federal funding and such costs may not be recognized as allowable cost share.
3. Performance of Work in the U.S. Requirement
All work performed under awards issued under this NOFO must be performed in the U.S. The recipient must flow down this requirement to its subrecipients.
Failure to Comply
If the recipient fails to comply with the Performance of Work in the U.S. requirement, DOE may deny reimbursement for the work conducted outside the U.S. and such costs may not be recognized as allowable recipient cost share. The recipient is responsible should any work under this award be performed outside the U.S., absent a waiver, regardless of whether the work is performed by the recipient, subrecipients, contractors or other project partners.
4. Foreign Travel
Foreign travel is not allowable under this NOFO. For more detail, please refer to NOFO Part 1, Application Content and Form—Funding Restrictions.
5. Lobbying
Recipients and subrecipients may not use any federal funds to influence or attempt to influence, directly or indirectly, congressional action on any legislative or appropriation matters.
Recipients and subrecipients are required to complete and submit SF-LLL, “Disclosure of Lobbying Activities” (https://www.grants.gov/forms/forms-repository/sf-424-individual-family) to ensure that non-federal funds have not been paid and will not be paid to any person for influencing or attempting to influence any of the following in connection with the application:
- An officer or employee of any federal agency;
- A Member of Congress;
- An officer or employee of Congress; or
- An employee of a Member of Congress.
6. Equipment and Supplies
All equipment and products purchased with funds made available under this NOFO should be American-made, to the greatest extent practicable. This requirement does not apply to used or leased equipment. This requirement does not supersede any other statutory requirement in the NOFO (e.g., Buy America Requirements for Infrastructure Projects).
7. Davis-Bacon Act Requirements
Refer to NOFO Part 1, Application Content and Form—Funding Restrictions to determine if the Davis-Bacon Act requirements are applicable (if “Davis-Bacon Act Requirements” is not listed in the Applicable Funding Restrictions table, it is not required).
For projects awarded under NOFOs that will be funded under Division D of the Infrastructure Investment and Jobs Act (IIJA), per Section 41101 of that law, all laborers and mechanics employed by the recipient, subrecipients, contractors, or subcontractors in the performance of construction, alteration, or repair work funded in whole or in part under the applicable NOFO Part 1 shall be paid wages at rates not less than those prevailing on similar projects in the locality, as determined by the Secretary of Labor in accordance with Subchapter IV of Chapter 31 of Title 40, U.S. Code commonly referred to as the Davis-Bacon Act (DBA).
Applicants shall provide written assurance acknowledging the DBA requirements above, confirming that the laborers and mechanics performing construction, alteration, or repair work on projects funded in whole or in part by awards made as a result of this NOFO are paid or will be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by Subchapter IV of Chapter 31 of Title 40, U.S. Code (Davis-Bacon Act).
Applicants acknowledge that they will comply with all the Davis-Bacon Act requirements, including but not limited to:
- Ensuring that the wage determination(s) and appropriate Davis-Bacon clauses and requirements are flowed down to and incorporated into any applicable subrecipient or contract awards;
- Ensuring that if wage determination(s) and appropriate Davis-Bacon clauses and requirements are improperly omitted from subrecipient or contract awards, the applicable wage determination(s) and clauses are retroactively incorporated to the start of performance;
- Being responsible for compliance by any subrecipient or contractor with the Davis-Bacon labor standards;
- Receiving and reviewing certified weekly payrolls submitted by all subrecipients or contractors for accuracy and to identify potential compliance issues;
- Maintaining original certified weekly payrolls for three years after the completion of the project and making those payrolls available to DOE or the U.S. Department of Labor (DOL) upon request, as required by 29 CFR 5.6(a)(2);
- Conducting payroll and job-site reviews for construction work, including interviews with employees, with such frequency as may be necessary to assure compliance by its subrecipients or contractors and as requested or directed by DOE;
- Cooperating with any authorized representative of DOL in its inspection of records, interviews with employees, and other actions undertaken as part of a DOL investigation;
- Posting in a prominent and accessible place the wage determination(s) and DOL Publication: WH-1321, Notice to Employees Working on Federal or Federally Assisted Construction Projects;
- Notifying the Grants Officer of all labor standards issues, including all complaints regarding incorrect payment of prevailing wages and/or fringe benefits, received from recipient, subrecipient, contractor, or subcontractor employees; significant labor standards violations, as defined in 29 CFR 5.7; disputes concerning labor standards pursuant to 29 CFR Parts 4, 6, and 8 and as defined in FAR 52.222-14; disputed labor standards determinations; DOL investigations; or legal or judicial proceedings related to the labor standards under this award, subrecipient award, contract or subcontract; and
- Preparing and submitting to the Grants Officer, the Office of Management and Budget Control Number 1910-5165, Davis Bacon Semi-Annual Labor Compliance Report, by April 21 and October 21 of each year.
Recipients will also be required to undergo Davis-Bacon Act compliance training and maintain competency in Davis-Bacon Act compliance. The Grants Officer will notify the recipient of any DOE-sponsored Davis-Bacon Act compliance trainings. DOL offers free Prevailing Wage Seminars several times a year that meet this requirement, at https://www.dol.gov/agencies/whd/government-contracts/construction/seminars/events.
For additional guidance on how to comply with the Davis-Bacon provisions and clauses, see https://www.dol.gov/agencies/whd/government-contracts/construction and https://www.dol.gov/agencies/whd/government-contracts/protections-for-workers-in-construction.
Recipients must ensure the timely submission of weekly certified payrolls as part of its compliance with the Davis-Bacon Act.
DOE has contracted with LCPtracker, a third-party DBA electronic payroll compliance software application, and recipients use of LCPtracker is mandatory absent a grant of a waiver. A waiver for the use of LCPtracker may be granted to a particular recipient if they are unable or limited in their ability to use or access the system. LCPtracker allows for certified payroll reports and workforce data to be uploaded electronically, 24 hours a day, 7 days per week and currently partners with several commercially available payroll systems. If a recipient uses a different payroll system, LCPtracker provides a free, spreadsheet template they can use to map out their payroll file, which would allow them to upload their employee and payroll data into the system. LCPtracker validation system checks payrolls for federal Davis-Bacon prevailing wage requirements by flagging mathematical errors or omission discrepancies for the recipient to review on a report. Examples include base hourly rate, total hourly rate, overtime, doubletime, apprentice approval, and fringe benefit contributions.
Additionally, LCPtracker utilizes industry standard eSignature technology, thus allowing recipients to electronically sign payroll reports versus using a wet signature. Individual program offices will coordinate with recipients on access and training.
For more information, visit Davis-Bacon Act Requirements for Recipients of Infrastructure Investment and Jobs Act Funding.
V. SUBMISSION REQUIREMENTS AND DEADLINES
Please refer to the NOFO Part 1, Application Content and Form—Application Content Requirements for all submission requirements and instructions including the content and form for each submission and deadlines.
The rest of this page is intentionally left blank.
VI. APPLICATION REVIEW INFORMATION
Please refer to the NOFO Part 1, Application Review Information—Review Criteria for specific compliance and technical criteria. The following describes the DOE evaluation and selection process that is applicable to all NOFOs.
A. Standard Evaluation and Selection Processes
1. Overview
The evaluation process consists of multiple phases; each includes an initial eligibility review and a thorough technical review. Rigorous technical reviews of eligible submissions are conducted by reviewers that are experts in the subject matter of the NOFO. Ultimately, the Selection Official considers the recommendations of the reviewers, along with other considerations such as program policy factors and risk reviews, in determining which applications to select.
2. Pre-Selection Clarification
DOE may determine that pre-selection clarifications are necessary from one or more applicants. These pre-selection clarifications will solely be for the purposes of clarifying the application. The pre-selection clarifications may occur before, during or after the merit review evaluation process. Information provided by an applicant that is not necessary to address the pre-selection clarification question will not be reviewed or considered. Typically, a pre-selection clarification will be carried out through either written responses to DOE’s written clarification questions or video or conference calls with DOE representatives.
The information provided by applicants to DOE through pre-selection clarifications is incorporated in their applications and contributes to the merit review evaluation and DOE’s selection decisions. If DOE contacts an applicant for pre-selection clarification purposes, it does not signify that the applicant has been selected for negotiation of award or that the applicant is among the top ranked applications.
DOE will not reimburse applicants for expenses relating to the pre-selection clarifications, nor will these costs be eligible for reimbursement as pre-award costs.
3. Recipient Responsibility and Qualifications
Prior to making a federal award with a total amount of federal share greater than the simplified acquisition threshold, DOE is required to review and consider any responsibility and qualification information about the applicant that is in the entity information domain in SAM.gov (see 41 U.S.C. § 2313).
The applicant, at its option, may review information in the entity information domain in SAM.gov and comment on any information about itself that a federal awarding agency previously entered and is currently in the entity information domain in SAM.gov.
DOE will consider any written comments by the applicant, in addition to the other information in the entity information domain in SAM.gov, in making a judgment about the applicant’s integrity, business ethics, and record of performance under federal awards when completing the review of risk posed by applicants as described in 2 CFR 200.206.
4. Due Diligence Review for Research, Technology and Economic Security
All applications submitted to DOE are subject to a due diligence review.
As DOE invests in critical infrastructure and funds critical and emerging technology areas, DOE considers possible threats to United States research, technology, and economic security from undue foreign government influence when evaluating risk. As part of the research, technology, and economic security risk review, DOE may contact the applicant and/or proposed project team members for additional information to inform the review. This risk review is conducted separately from the technical merit review.
All project participants, which for purposes of this term includes individuals participating in the project, are subject to RTES due diligence reviews. The due diligence review of covered individuals includes but is not limited to the review of resumes/biosketches, disclosures, and certifications, as required in the NOFO. DOE reserves the right to require resumes/biosketches, disclosures, and certifications for project participants not defined as covered individuals. The Applicant need not submit any additional information on non-covered individuals, unless requested by DOE. The volume and type of information collected may depend on various factors associated with the award.
Note this review is separate and distinct from DOE Order 142.3B “Unclassified Foreign National Access Program”.
In the event an RTES risk is identified, DOE may require risk mitigation measures, including but not limited to, requiring that an individual or entity not participate in the award. If significant risks are identified and cannot be sufficiently mitigated, DOE may elect to not fund the applicant.
Consistent with section 4(e) of the Presidential Memorandum on United States Government-Supported Research and Development National Security Policy-33 (NSPM-33), DOE may share information regarding the risks identified as part of the RTES due diligence review process or monitoring with other Federal agencies.
DOE’s decision regarding a due diligence review is not appealable.
5. Evaluation and Administration by Non-Federal Personnel
In conducting the merit review evaluation and Peer Reviews, the government may seek the advice of qualified non-federal personnel as reviewers. The government may also use non-federal personnel to conduct routine, nondiscretionary administrative activities, including DOE contractors. The applicant, by submitting its application, consents to the use of non-federal reviewers/administrators. Non-federal reviewers must sign conflict of interest (COI) and non-disclosure acknowledgements (NDA) prior to reviewing an application. Non-federal personnel conducting administrative activities must sign an NDA.
6. Selection
The Selection Official may consider the technical merit, the Federal Consensus Board’s recommendations, program policy factors, risk reviews, and the amount of funds available in arriving at selections for this NOFO.
VII. SELECTION AND AWARD NOTICES
DOE anticipates notifying applicants selected for negotiation of award and negotiating awards by the dates provided on the NOFO Part 1, Basic Information—Key Dates.
A. Selection Notices
1. Ineligible Submissions
Ineligible applications will not be further reviewed or considered for award. DOE will send a notification letter by email to the technical and administrative points of contact designated by the applicant on the submitted application. The notification letter will state the basis upon which the concept paper or the application is ineligible and not considered for further review.
2. Application Notifications
DOE will notify applicants of its determination via a notification letter by email to the technical and administrative points of contact designated by the applicant in the submitted application. The notification letter will inform the applicant whether its application was selected for award negotiations. Alternatively, DOE may notify one or more applicants that a final selection determination on particular applications will be made at a later date, subject to the availability of funds or other factors.
3. Applicants Selected for Award Negotiations
DOE may stagger its selection determinations. As a result, some applicants may receive their notification letter in advance of other applicants. Successful applicants will receive written notification that they have been selected for award negotiations including estimated award negotiation dates. Receipt of a notification letter selecting an application for award negotiations does not authorize the applicant to commence performance of the project. If an application is selected for award negotiations, it is not a commitment by DOE to issue an award nor is it a guarantee of federal government funding. Applicants do not receive an award until award negotiations are complete and the Grants Officer executes the funding agreement, accessible by the recipient in FedConnect.
The award negotiation process can take a minimum of 60 days up to 180 days depending on the complexity of the project and responsiveness of the selectee among other factors. Applicants must designate a primary and a backup point-of-contact on the application with whom DOE will communicate to conduct award negotiations.
The applicant must be responsive during award negotiations by providing requested documentation, including post-selection documentation, and meet the negotiation deadlines. If the applicant fails to do so or if award negotiations are otherwise unsuccessful, DOE will cancel the award negotiations and rescind the Selection. DOE reserves the right to terminate award negotiations at any time for any reason.
Please refer to the Pre-Award Costs section above for guidance on pre-award costs.
4. Alternate Selections
In some instances, an applicant may receive a notification that its application was not selected for award and DOE designated the application to be an alternate. As an alternate, DOE may consider the application for federal funding in the future. A notification letter stating the application is designated as an alternate does not authorize the applicant to commence performance of the project. DOE may ultimately determine to select or not select the application for award negotiations.
5. Applicants Not Selected for Award Negotiations
DOE shall promptly notify in writing each applicant whose application has not been selected for award negotiation or whose application cannot be funded because of the unavailability of appropriated funds.
B. Post-Selection Information Requests
To reduce burden in the application process, DOE has instituted Post-Selection Information Requests and Submissions procedures. These procedures allow certain elements of an application to be submitted later in the application process, either prior to merit review or after merit review when the application is under consideration for funding.
Applicants will be notified (primarily by e-mail) when Post-Selection Information is needed. This notification is not a Notice of Award, nor should it be construed to be an indicator of possible funding. Applicants should only submit this information when requested. The applicant will be notified on what documents and materials to submit, the format required and where and when to submit.
1. Example Information Requests
The following is a list of examples of information that may be required to complete award negotiations:
- Personnel proposed to work on the project and collaborating organizations;
- Participants and Collaborating Organizations;
- Current and Pending Support;
- Other budget information;
- Indirect cost information;
- Letters of Commitment from third parties contributing to cost share, if applicable;
- Name and phone number of the Designated Responsible Employee for complying with national policies prohibiting discrimination (See 10 CFR 1040.5);
- Information for the DOE Office of Civil Rights to process assurance reviews under 10 CFR 1040;
- Environmental Checklist;
- Lobbying disclosure;
- Representation of Limited Rights Data and Restricted Software, if applicable; and
- For construction projects: information related to Davis-Bacon Act requirements; Operations Workforce Continuity Plan.
2. Entity Risk Assessment
Pursuant to 2 CFR 200.206, DOE may conduct an additional review of the risk posed by applications submitted under the applicable NOFO Part 1. This risk assessment may consider:
- Financial stability;
- Quality of management systems and ability to meet the management standards prescribed in 2 CFR Part 200 as adopted and supplemented by 2 CFR Part 910;
- History of performance;
- Audit reports and findings; and
- The applicant's ability to effectively implement statutory, regulatory, or other requirements imposed on recipients or subrecipients.
DOE may make use of other publicly available information and the history of an applicant’s performance under DOE or other federal agency awards.
Depending on the severity of the findings and whether the findings were resolved, DOE may elect not to fund the applicant.
In addition to this review, DOE must comply with the guidelines on government-wide suspension and debarment in 2 CFR Part 180 and must require recipients or subrecipients to comply with these provisions. These provisions restrict federal awards, subawards and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in federal programs or activities.
3. Environmental Review in Accordance with National Environmental Policy Act (NEPA)
DOE’s decision whether and how to distribute federal funds under this NOFO is subject to NEPA (42 U.S.C. § 4321, et seq.). DOE will determine whether NEPA applies, in accordance with Section 2.1 of DOE's NEPA implementing procedures published on June 30, 2025. DOE NEPA Implementing Procedures (June 2025) | Department of Energy
NEPA requires federal agencies to consider the potential environmental impacts of their proposed actions in agency decision-making. For additional background on NEPA, please see DOE’s NEPA website at https://www.energy.gov/nepa.
While NEPA compliance is a federal agency responsibility and the ultimate decisions remain with the federal agency, all applicants selected for award negotiations and recipients of an award will be required to assist in the timely and effective completion of the NEPA process in the manner most pertinent to their proposed project. If DOE determines certain documents must be prepared to complete the NEPA review process, the recipient may be required to prepare the documents and the costs to prepare the necessary documents may be included as part of the project costs. DOE will independently evaluate the environmental document and will take responsibility for the contents, including ensuring the professional integrity of the discussion and analysis, as required by NEPA.
National Historic Preservation Act (NHPA)
DOE must comply with the requirements of Section 106 of the National Historic Preservation Act (NHPA) prior to deciding whether or how to distribute federal funds. Section 106 requires DOE to identify and consider adverse effects from the proposed project to historic properties that are listed in or eligible for listing in the National Register of Historic Places and consult with the State Historic Preservation Office(s), Indian Tribe(s), local government(s), and others with economic or legal relation to the proposed project or affected properties, as appropriate, about historic properties and potential adverse effects to them. DOE may perform a NHPA review under the umbrella of its NEPA review and will require applicants to assist in this review and consider impacts to historic, Tribal, and cultural resources.
4. Flood Resilience
Executive Order 11988, Floodplain Management, requires agencies engage in a decision-making process to evaluate the potential effects of any action it may take in a floodplain and to avoid development in a floodplain to the extent possible. Selectees will be required to indicate whether the proposed project location(s) is within a floodplain, how the floodplain was defined, and how the project’s design has been modified to reduce the risk of flood loss and minimize the impact of floods on human safety, health, and welfare.
5. Trafficking in Persons
Awards under this NOFO will be subject to the requirements at 2 CFR Part 175, Award Term for Trafficking in Persons, including the compliance plan and certification requirements applicable if the estimated value of services required to be performed under the grant or cooperative agreement outside the U.S. exceeds $500,000.
6. Operations Workforce Continuity Plan
Required for awards inclusive of any project that will have more than 100 employees in operation, including contract workers who are not W2 employees, and where DOE is contributing 10 percent or more of the project amount, or as otherwise selected by DOE.
If selected for award negotiations, within 30 days of the notification of selection for award negotiations, the selectee must submit an Operations Workforce Continuity Plan. A Workforce Continuity Plan template is provided at https://www.energy.gov/infrastructure/reporting-checklists with the intent to reduce the administrative burden by promoting the use of common formats.
C. Award Notices
Upon successful completion of award negotiations, the DOE Grants Officer will approve the award, and the recipient will then receive notification of award and can access it in the FedConnect system. Selectees must be registered in FedConnect to receive the final award package after successful completion of award negotiations.
Registering with FedConnect® is fast, easy, and free. Only individuals who are designated as Points of Contact in SAM.gov can create a new company account.
- What is it? It’s how recipient receive their legally executed award package.
- The SAM Unique Entity Identifier Number (UEI) must be obtained before this registration can be initiated.
- Review the FedConnect Ready, Set, Go! Guide at https://www.fedconnect.net/FedConnect/Marketing/Documents/FedConnect_Ready_Set_Go.pdf.
- Duration to complete: can take two to three days.
- Registration Link: FedConnect website: https://www.fedconnect.net/FedConnect/PublicUserRegistration.aspx
- HELP: https://www.fedconnect.net/FedConnect/TechSupport.aspx
Electronic Authorization of Applications and Award Documents
Submission of an application and supplemental information under the NOFO Part 1 through electronic systems used by the DOE, including NEUP.gov and FedConnect, constitutes the authorized representative’s approval and electronic signature.
VIII. AWARD ADMINISTRATION INFORMATION
A. Post-Award Requirements and Administration
Note: Please review this document prior to applying.
DOE requires all award recipients to follow and accept requirements governed by laws and policies – both federal government-wide and DOE or program specific. These post-award requirements include: all National and Administrative Policy Requirements; financial assistance general Certifications and Representations; Build America, Buy America requirements; Davis-Bacon Act requirements; Risk-Based Review of Project Participants; Performance of Work in the U.S. (Foreign Work Waiver); Infrastructure and Investment Jobs Act-Specific Requirements; Fraud, Waste and Abuse requirements; Safety, Security, and Regulatory requirements; and Environmental Review in Accordance with National Environmental Policy Act requirements.
Recipients of an award made under DOE NOFOs must comply with requirements of all applicable federal, state, and local laws, regulations, DOE policy and guidance, instructions in this NOFO, and the award terms and conditions. Recipients must require subrecipients’ compliance with all applicable requirements. Reporting requirements are identified on the Federal Assistance Reporting Checklist, attached to the award agreement.
All DOE award recipients must adhere to the following:
1. Award Administrative Requirements
The administrative requirements for DOE grants and cooperative agreements are contained in 2 CFR Part 200 as adopted and supplemented by 2 CFR Part 910.
2. Subaward and Executive Reporting
Additional administrative requirements necessary for DOE grants and cooperative agreements to comply with the Federal Funding and Transparency Act of 2006 (FFATA) are contained in 2 CFR Part 170. Recipients must register with the FFATA Subaward Reporting System database and report the required data on their first tier subrecipients. Recipients must report the executive compensation for their own executives as part of their registration profile in SAM.
3. National Policy Requirements
The National Policy Assurances that are incorporated as a term and condition of award are located at: http://www.nsf.gov/awards/managing/rtc.jsp.
4. Applicant Representations and Certifications
Lobbying Restrictions
By accepting funds under this award, the recipient agrees that none of the funds obligated on the award shall be expended, directly or indirectly, to influence Congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. § 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation.
Corporate Felony Conviction and Federal Tax Liability Representations
In submitting an application to a NOFO, the applicant represents that:
a. It is not a corporation that has been convicted of a felony criminal violation under any federal law within the preceding 24 months; and
b. It is not a corporation that has any unpaid federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
For purposes of these representations, a corporation is any for-profit or nonprofit entity that has filed articles of incorporation in any of the 50 states, the District of Columbia, or the various territories of the U.S. [but not foreign corporations].
Nondisclosure and Confidentiality Agreements Representations
In submitting an application to a NOFO the applicant represents that:
a. It does not and will not require its employees or contractors to sign internal nondisclosure or confidentiality agreements or statements prohibiting or otherwise restricting its employees or contactors from lawfully reporting waste, fraud, or abuse to a designated investigative or law enforcement representative of a federal department or agency authorized to receive such information.
b. It does not and will not use any federal funds to implement or enforce any nondisclosure and/or confidentiality policy, form, or agreement it uses unless it contains the following provisions:
“These provisions are consistent with and do not supersede, conflict with, or otherwise alter the employee obligations, rights, or liabilities created by existing statute or Executive Order relating to (1) classified information, (2) communications to Congress, (3) the reporting to an Inspector General of a violation of any law, rule, or regulation, or mismanagement, a gross waste of funds, an abuse of authority, or a substantial and specific danger to public health or safety, or (4) any other whistleblower protection. The definitions, requirements, obligations, rights, sanctions, and liabilities created by controlling Executive Orders and statutory provisions are incorporated into this agreement and are controlling.”
(1) The limitation above shall not contravene requirements applicable to Standard Form 312 Classified Information Nondisclosure Agreement (https://fas.org/sgp/othergov/sf312.pdf), Form 4414 Sensitive Compartmented Information Disclosure Agreement (https://fas.org/sgp/othergov/intel/sf4414.pdf), or any other form issued by a federal department or agency governing the nondisclosure of classified information.
(2) Notwithstanding the provision listed in paragraph (a), a nondisclosure or confidentiality policy form or agreement that is to be executed by a person connected with the conduct of an intelligence or intelligence-related activity, other than an employee or officer of the U.S. Government, may contain provisions appropriate to the activity for which such document is to be used. Such form or agreement shall, at a minimum, require that the person will not disclose any classified information received during such activity unless specifically authorized to do so by the U.S. Government. Such nondisclosure or confidentiality forms shall also make it clear that they do not bar disclosures to Congress, or to an authorized official of an executive agency or the U.S. Department of Justice, that are essential to reporting a substantial violation of law.
5. Statement of Federal Stewardship
DOE will exercise normal federal stewardship in overseeing the project activities performed under DOE awards. Stewardship activities include but are not limited to conducting site visits; reviewing performance and financial reports; providing assistance and/or temporary intervention in unusual circumstances to correct deficiencies that develop during the project; assuring compliance with terms and conditions; and reviewing technical performance after project completion to ensure that the project objectives have been accomplished.
Recipient’s Responsibilities. The recipient is responsible for:
- Complying with all award requirements, including performing the activities supported by this award, including providing the required personnel, facilities, equipment, supplies and services.
- Defining approaches and plans as may be required by this award, submitting the plans to DOE for review, and incorporating DOE’s comments.
- Managing and conducting the project activities, including coordinating with DOE management and operating (M&O) contractor(s) as required and as proposed in the recipient’s project plan on activities performed under the M&O contract(s) that are related to the project.
- Attending annual program review meetings and reporting project status, if requested by the program.
- Submitting technical reports as stated in the Federal Assistance Reporting Checklist and incorporating DOE comments.
- Completing reporting requirements as outlined in the instructions provided in the awards Attachment B “Federal Assistance Reporting Checklist and Instructions” including:
- NE Program Information Collection System (PICS:NE): PIs are required to complete reporting requirements as outlined in the instructions provided in the awards Attachment B “Federal Assistance Reporting Checklist and Instructions”. Information provided in required award reporting will be utilized to populate PICS:NE (PICS:NE data entry will be done by DOE using information provided by the PI). PIs may be asked by the DOE PICS:NE representative for additional information during the initial work package setup process to accurately document the project plan, as well as through the award’s project period to populate information in PICS:NE. PIs may be requested to provide additional assistance for clarification purposes in assuring accuracy of the information being entered into PICS:NE.
- NE Program Accrual Information: DOE policy requires the monthly tracking of uncosted obligations on financial assistance awards in the DOE accounting system to assist DOE in accomplishing more accurate project management and to more accurately recognize Department liabilities to the recipient. DOE personnel do this internally by subtracting paid costs and any costs accrued (yet to be paid incurred costs of the recipient) from the amounts obligated on the financial assistance award. In accomplishing this, DOE may request the recipient provide additional cost accrual information to accurately estimate/document the accrual in the DOE accounting system. If such information is needed, it will typically be done on awards over $1M and DOE will normally do this using an e-mail to the recipient requesting the recipient identify the dollar value of work it has performed each month but not yet invoiced (or done a Treasury system draw on) as of month end. Recipients will cooperate with DOE in providing the needed cost accrual information.
Note: There are limitations on recipient responsibilities and authorities in the performance of the project activities. Performance of the project activities must be within the scope of the Statement of Objectives, the terms and conditions of the grant, and the funding and schedule constraints.
6. Uniform Commercial Code (UCC) Financing Statements
Per 2 CFR 910.360 (Real Property and Equipment) when a piece of equipment is purchased by a for-profit recipient or subrecipient with federal funds, and when the federal share of the financial assistance agreement is more than $1 million the recipient or subrecipient must:
- Properly record, and consent to the Department’s ability to properly record if the recipient fails to do so, UCC financing statement(s) for all equipment in excess of $10,000 purchased with project funds.
- These financing statement(s) must be approved in writing by the Grants Officer prior to the recording, and they shall provide notice that the recipient’s title to all equipment (not real property) purchased with federal funds under the financial assistance agreement is conditional pursuant to the terms of this section, and that the government retains an undivided reversionary interest in the equipment.
- The UCC financing statement(s) must be filed before the Grants Officer may reimburse the recipient for the federal share of the equipment unless otherwise provided for in the relevant financial assistance agreement.
- The recipient shall further make any amendments to the financing statements or additional recordings, including appropriate continuation statements, as necessary or as the Grants Officer may direct.
7. Interim Conflict of Interest Policy for Financial Assistance
The DOE interim Conflict of Interest Policy for Financial Assistance (COI Policy)3 is applicable to all recipients or subrecipients applying for, or that receive, DOE funding by means of a financial assistance award (e.g., a grant or cooperative agreement) and, through the implementation of this policy by the entity, to each Investigator who is planning to participate in, or is participating in, the project funded wholly or in part under the DOE financial assistance award. The term “Investigator” means the PI and any other person, regardless of title or position, who is responsible for the purpose, design, conduct, or reporting of a project funded by DOE or proposed for funding by DOE. Recipients must flow down the requirements of the interim COI Policy to any subrecipient. Further, for DOE funded projects, the recipient must include all financial conflicts of interest (FCOI) (i.e., managed and unmanaged/unmanageable) in its initial and ongoing FCOI reports.
It is understood that recipients or subrecipients receiving DOE financial assistance awards will need sufficient time to come into full compliance with DOE’s interim COI Policy. To provide some flexibility, DOE allows for a staggered implementation. Specifically, prior to award, applicants selected for award negotiations must:
- ensure all Investigators complete their significant financial disclosures;
- review the disclosures;
- determine whether a FCOI exists;
- develop and implement a management plan for FCOIs; and
- provide DOE with an initial FCOI report that includes all FCOIs (i.e., managed and unmanaged/unmanageable).
Recipients will have 180 days from the date of the award to come into full compliance with the other requirements set forth in DOE’s interim COI Policy. Prior to award, the applicant must certify that it is, or will be within 180 days of the award, compliant with all requirements in the COI Policy.
8. Whistleblower Protections
As provided in 2 CFR 200.217, an employee of a recipient or subrecipient must not be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing information that the employee reasonably believes is evidence of gross mismanagement of a federal contract or grant, a gross waste of federal funds, an abuse of authority relating to a federal contract or grant, a substantial and specific danger to public health or safety, or a violation of law, rule, or regulation related to a federal contract (including the competition for or negotiation of a contract) or grant. The recipient and subrecipient must inform their employees in writing of employee whistleblower rights and protections.
9. Fraud, Waste, and Abuse
The mission of the DOE Office of Inspector General (OIG) is to strengthen the integrity, economy, and efficiency of the Department’s programs and operations, including deterring and detecting fraud, waste, abuse, and mismanagement. The OIG accomplishes this mission primarily through investigations, audits, and inspections of DOE activities to include grants, cooperative agreements, loans, and contracts.
The OIG maintains a hotline for reporting allegations of fraud, waste, abuse, or mismanagement. To report such allegations, please visit https://www.energy.gov/ig/ig-hotline.
Additionally, recipients of DOE awards must be cognizant of the requirements of 2 CFR 200.113 Mandatory disclosures, which states:
An Applicant, Recipient, or Subrecipient of a federal award must promptly disclose whenever, in connection with the federal award (including any activities or subawards thereunder), it has credible evidence of the commission of a violation of federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of the U.S. Code or a violation of the civil False Claims Act (31 U.S.C. 3729–3733). The disclosure must be made in writing to the federal agency, the agency’s Office of Inspector General, and pass-through entity (if applicable). Recipients and subrecipients are also required to report matters related to recipient integrity and performance in accordance with Appendix XII of this part. Failure to make required disclosures can result in any of the remedies described in 2 CFR 200.339. (See also 2 CFR part 180, 31 U.S.C. § 3321, and 41 U.S.C. § 2313.) [85 FR 49539, Aug. 13, 2020]
Applicants/recipients and subrecipients (if applicable) are encouraged to allocate sufficient costs in the project budget to cover the costs associated for personnel and data infrastructure needs to support performance management and program evaluation needs, including but not limited to independent program and project audits to mitigate risks for fraud, waste, and abuse.
10. Participants and Collaborating Organizations
If selected for award negotiations, the selected applicant must submit a list of personnel who are proposed to work on the project, both at the recipient and subrecipient level and a list of proposed collaborating organizations prior to award. Recipients will have an ongoing responsibility to notify DOE of changes to the personnel and collaborating organizations and submit updated information during the life of the award.
11. Current and Pending Support
Throughout the life of the award, the recipient has an ongoing responsibility to submit:
- current and pending support disclosure statements and resumes/biosketches for any new covered individuals, and
- updated disclosures if there are changes to the current and pending support or resume/biosketch previously submitted to DOE.
Also see the Current and Pending Support information in the Application Contents Requirements section above.
12. Prohibition Related to Malign Foreign Talent Recruitment Programs
Prohibition
Individuals participating in a Malign Foreign Talent Recruitment Program are prohibited from participating in this award.
Should an award result from this NOFO, the recipient must exercise ongoing due diligence to reasonably ensure that no such individuals participating on the DOE-funded project are participating in a Malign Foreign Talent Recruitment Program. Consequences for violations of this prohibition will be determined according to applicable law, regulations, and policy.
Further, the recipient must notify DOE within five (5) business days upon learning that an individual on the project team is or is believed to be participating in a malign foreign talent recruitment program. DOE may modify and add requirements related to this prohibition to the extent required by law.
Required Certifications
- a. Each covered individual must certify that they are not party to a Malign Foreign Talent Recruitment Program.
- b. The applicant and the subrecipients must certify that the covered individuals in their respective employment have been made aware of the Malign Foreign Talent Recruitment Program prohibition and have complied with their certification responsibilities identified in a.
Non-Discrimination
DOE will ensure that the Malign Foreign Talent Recruitment Program Prohibition is carried out in a manner that does not target, stigmatize, or discriminate against individuals on the basis of race, color, or national origin, consistent with title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq.).
Definitions
Malign Foreign Talent Recruitment Program, as defined in P.L. 117-167, Section 10638(4):
A) any program, position, or activity that includes compensation in the form of cash, in-kind compensation, including research funding, promised future compensation, complimentary foreign travel, things of non de minimis value, honorific titles, career advancement opportunities, or other types of remuneration or consideration directly provided by a foreign country at any level (national, provincial, or local) or their designee, or an entity based in, funded by, or affiliated with a foreign country, whether or not directly sponsored by the foreign country, to the targeted individual, whether directly or indirectly stated in the arrangement, contract, or other documentation at issue, in exchange for the individual—
- i. engaging in the unauthorized transfer of intellectual property, materials, data products, or other nonpublic information owned by a U.S. entity or developed with a federal research and development award to the government of a foreign country or an entity based in, funded by, or affiliated with a foreign country regardless of whether that government or entity provided support for the development of the intellectual property, materials, or data products;
- ii. being required to recruit trainees or researchers to enroll in such program, position, or activity;
- iii. establishing a laboratory or company, accepting a faculty position, or undertaking any other employment or appointment in a foreign country or with an entity based in, funded by, or affiliated with a foreign country if such activities are in violation of the standard terms and conditions of a federal research and development award;
- iv. being unable to terminate the foreign talent recruitment program contract or agreement except in extraordinary circumstances;
- v. through funding or effort related to the foreign talent recruitment program, being limited in the capacity to carry out a research and development award or required to engage in work that would result in substantial overlap or duplication with a federal research and development award;
- vi. being required to apply for and successfully receive funding from the sponsoring foreign government's funding agencies with the sponsoring foreign organization as the recipient;
- vii. being required to omit acknowledgment of the recipient institution with which the individual is affiliated, or the federal research agency sponsoring the research and development award, contrary to the institutional policies or standard terms and conditions of the federal research and development award;
- viii. being required to not disclose to the federal research agency or employing institution the participation of such individual in such program, position, or activity; or
- ix. having a conflict of interest or conflict of commitment contrary to the standard terms and conditions of a federal research and development award; and
B) a program that is sponsored by—
- i. a foreign country of concern or an entity based in a foreign country of concern, whether or not directly sponsored by the foreign country of concern;
- ii. an academic institution on the list developed under section 1286(c)(8) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1 Public Law 115–232); or
- iii. a foreign talent recruitment program on the list developed under section 1286(c)(9) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 2358 note; 1 Public Law 115–232).
Consistent with applicable law (42 U.S.C. 19232), this provision does not prohibit, unless such activities are funded, organized, or managed by an academic institution or a foreign talent recruitment program on the lists developed under paragraphs (8) and (9) of section 1286(c) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (10 U.S.C. 4001 note; Public Law 115–232)—
- A) making scholarly presentations and publishing written materials regarding scientific information not otherwise controlled under current law;
- B) participation in international conferences or other international exchanges, research projects or programs that involve open and reciprocal exchange of scientific information, and which are aimed at advancing international scientific understanding and not otherwise controlled under current law;
- C) advising a foreign student enrolled at an institution of higher education or writing a recommendation for such a student, at such student's request; and
- D) other international activities determined appropriate by the federal research agency head or designee.
13. Foreign Collaboration Considerations
For new collaborations with foreign entities, organizations, and governments, the recipient will be required to provide DOE with advanced written notification of any potential collaboration with foreign entities, organizations, or governments in connection with its DOE-funded award scope. The recipient will then be required to await further guidance from DOE prior to contacting the proposed foreign entity, organization, or government regarding the potential collaboration or negotiating the terms of any potential agreement.
For existing collaborations with foreign entities, organizations, and governments, the recipient will be required to provide DOE with a written list of all existing foreign collaborations in which it has entered in connection with its DOE-funded award scope.
Description of collaborations that should be reported:
- In general, a collaboration will involve some provision of a thing of value to, or from, the recipient.
- A thing of value includes but may not be limited to all resources made available to, or from, the recipient in support of and/or related to the DOE award, regardless of whether they have monetary value.
- Things of value also may include in-kind contributions (such as office/laboratory space, data, equipment, supplies, employees, students).
- In-kind contributions not intended for direct use on the DOE award but resulting in provision of a thing of value from or to the DOE award must also be reported.
Collaborations do not include routine workshops, conferences, use of the recipient’s services and facilities by foreign investigators resulting from its standard published process for evaluating requests for access, or the routine use of foreign facilities by awardee staff in accordance with the recipient’s standard policies and procedures.
14. U.S. Manufacturing Commitments
Refer to NOFO Part 1, Award Administration Information—Post-Award Requirements to determine if U.S. Manufacturing Commitments are applicable (if “U.S. Manufacturing Commitments” is not listed in the Applicable Post-Award Requirements and Administration table, it is not required). If applicable, the following applies:
A primary objective of DOE’s multi-billion-dollar research, development, and demonstration investments is to cultivate new research and development ecosystems, manufacturing capabilities, and supply chains for and by U.S. industry and labor. Therefore, in exchange for receiving taxpayer dollars to support an applicant’s project, the applicant/recipient and any subrecipient and contractor must agree to a U.S. Competitiveness provision requiring that any products embodying any subject invention or produced through the use of any subject invention will be manufactured substantially in the U.S. unless the applicant/recipient can show to the satisfaction of DOE that it is not commercially feasible. Award terms, including the specific U.S. Competitiveness Provision applicable to the various types of recipients and projects, are available at https://www.energy.gov/gc/standard-intellectual-property-ip-provisions-financial-assistance-awards.
Please note that a subject invention is any invention conceived or first actually reduced to practice in performance of work under an award. An invention is any invention or discovery which is or may be patentable. The recipient includes any awardee, recipient, subawardee, or subrecipient.
As noted in the U.S. Competitiveness Provision, if an entity cannot meet the requirements of the U.S. Competitiveness Provision, the entity may request a modification or waiver of the U.S. Competitiveness Provision. For example, the entity may propose modifying the language of the U.S. Competitiveness Provision in order to change the scope of the requirements or to provide more specifics on the application of the requirements for a particular technology. As another example, the entity may request that the U.S. Competitiveness Provision be waived in lieu of a net benefits statement or U.S. manufacturing plan. The statement or plan would contain specific and enforceable commitments that would be beneficial to the U.S. economy and competitiveness. Examples of such commitments could include manufacturing specific products in the U.S., making a specific investment in a new or existing U.S. manufacturing facility, keeping certain activities based in the U.S. or supporting a certain number of jobs in the U.S. related to the technology. DOE may, in its sole discretion, determine that the proposed modification or waiver promotes commercialization and provides substantial U.S. economic benefits, and grant the request. If granted, DOE will modify the award terms and conditions for the requesting entity accordingly.
More information and guidance on the waiver and modification request process can be found in the DOE Financial Assistance Letter on this topic, available at https://www.energy.gov/management/pf-2022-09-fal-2022-01-implementation-doe-determination-exceptional-circumstances-under. Additional information on DOE’s Commitment to Domestic Manufacturing for DOE-funded R&D is available at https://www.energy.gov/gc/us-manufacturing.
The U.S. Competitiveness Provision is implemented by DOE pursuant to a Determination of Exceptional Circumstances (DEC) under the Bayh-Dole Act and DOE Patent Waivers. Please refer to the Title to Subject Inventions section below for more information on the DEC and DOE Patent Waivers.
15. Subject Invention Utilization Reporting
To ensure that recipients, subrecipients, and contractors holding title to subject inventions are taking the appropriate steps to commercialize subject inventions, DOE requires that each recipient, subrecipient, and contractor holding title to a subject invention submit annual reports for 10 years from the date the subject invention was disclosed to DOE on the utilization of the subject invention and efforts made by recipient or its licensees or assignees to stimulate such utilization. The reports must include information regarding the status of development, date of first commercial sale or use, gross royalties received by the recipient, and such other data and information as DOE may specify.
16. Intellectual Property Provisions
The standard DOE financial assistance intellectual property provisions applicable to the various types of recipients are located at http://energy.gov/gc/standard-intellectual-property-ip-provisions-financial-assistance-awards.
17. Conference Spending
The recipient shall not expend any funds on a conference not directly and programmatically related to the purpose for which the grant or cooperative agreement was awarded that would defray the cost to the U.S. government of a conference held by any Executive branch department, agency, board, commission, or office for which the cost to the U.S. Government would otherwise exceed $20,000, thereby circumventing the required notification by the head of any such Executive Branch department, agency, board, commission, or office to the Inspector General (or senior ethics official for any entity without an Inspector General), of the date, location, and number of employees attending such conference.
18. Cost Share Payment
DOE requires recipients to contribute the cost share amount incrementally over the life of the award. The terms and conditions of the award will specify the recipient’s cost share interval, such as by billing period or on a budget period basis. The recipient’s cost share for each interval must always reflect the overall cost share ratio negotiated by the parties (e.g., the total amount of cost sharing on each invoice when considered cumulatively with previous invoices must reflect, at a minimum, the cost sharing percentage negotiated). When FFRDC funding will be provided directly to the FFRDC(s) by DOE, recipients will be required to provide project cost share at a percentage commensurate with the FFRDC costs, on a budget period basis, resulting in a higher interim invoicing cost share ratio than the total award ratio.
In limited circumstances, and where it is in the government’s interest, the DOE Grants Officer may approve a request by the recipient to meet its cost share requirements on a less frequent basis than required by the terms and conditions of the award. Regardless of the interval requested, the recipient must be up to date on cost share at each interval. Such requests must be sent to the Grants Officer during award negotiations and include the following information:
- a detailed justification for the request;
- a proposed schedule of payments, including amounts and dates;
- a written commitment to meet that schedule; and
- such evidence as necessary to demonstrate that the recipient has complied with its cost share obligations to date.
The Grants Officer must approve all such requests before they go into effect.
19. Implementation of Executive Order 13798, Promoting Free Speech and Religious Liberty
States, local governments, and other public entities may not condition subawards in a manner that would discriminate against or otherwise disadvantage subrecipients based on their religious character.
20. Pay Transparency Requirements
All recipients must comply with all applicable federal labor and employment laws, including but not limited to Title VII of the Civil Rights Act of 1964, the Fair Labor Standards Act, the Occupational Safety and Health Act, and the National Labor Relations Act, which protects employees’ right to bargain collectively and engage in other concerted activities for the purpose of mutual aid or protection.
21. Human Subjects Research
Research involving human subjects, biospecimens, or identifiable private information conducted with DOE funding is subject to the requirements of DOE Order 443.1C, Protection of Human Research Subjects, 45 CFR Part 46, Protection of Human Subjects (subpart A which is referred to as the “Common Rule”), and 10 CFR Part 745, Protection of Human Subjects. Additional information on the DOE Human Subjects Research Program can be found at: HUMAN SUBJECTS Human Subjects Pr... | U.S. DOE Office of Science (SC) (osti.gov).
B. Reporting
Reporting requirements are identified on the Federal Assistance Reporting Checklist, attached to the award agreement.
DOE must measure the performance to show achievement of program goals and objectives, share lessons learned, improve program outcomes, and foster the adoption of promising practices. DOE will establish program goals and objectives during negotiations and incorporate it into the award terms. To clearly communicate the specific reporting requirements to meet the program goals and objectives in the federal award, DOE combined all reporting into one document, the Federal Assistance Reporting Checklist. This document, attached to the award agreement, provides any expected outcomes (such as outputs, service performance, or public impacts of any of these), indicators, targets, baseline data, or data collections that the applicant will be responsible for measuring and reporting.
Refer to the Federal Assistance Reporting Checklist (DOE F 4600.2), attached to the award package, for award-specific reporting requirements.
IX. OTHER INFORMATION
A. Government Right to Reject or Negotiate
DOE reserves the right, without qualification, to reject any or all applications received in response to this NOFO and to select any application, in whole or in part, as a basis for negotiation and/or award.
B. Commitment of Public Funds
The Grants Officer is the only individual who can make awards or commit the government to the expenditure of public funds. A commitment by anyone other than the Grants Officer, either express or implied, is invalid.
C. Treatment of Application Information
Applicants should not include trade secrets or business-sensitive, proprietary, or otherwise confidential information in their application unless such information is necessary to convey an understanding of the proposed project or to comply with a requirement in the NOFO. Applicants are advised to not include any critically sensitive proprietary detail.
The Freedom of Information Act, 5 U.S.C. 552, requires DOE to release certain federal financial assistance documents and records requested by members of the public regardless of the intended use of the information. DOE will release funded applications and funded progress reports, including award data, as legally releasable at the conclusion of the competitive funding process. However, DOE will generally withhold this information during the pendency of competitive stages of the funding process.
If an application includes trade secrets or business-sensitive, proprietary, or otherwise confidential information, it is furnished to the federal government in confidence with the understanding that the information shall be used or disclosed only for evaluation of the application. Such information will be withheld from public disclosure to the extent permitted by law, including the Freedom of Information Act. Without assuming any liability for inadvertent disclosure, DOE will seek to limit disclosure of such information to its employees and to outside reviewers when necessary for merit review of the application or as otherwise authorized by law. This restriction does not limit the federal government’s right to use the information if it is obtained from another source.
Applications and other submissions containing trade secrets or business-sensitive, proprietary, or otherwise confidential information must be marked as described below. Failure to comply with these marking requirements may result in the disclosure of the unmarked information under the Freedom of Information Act or otherwise. The federal government is not liable for the disclosure or use of unmarked information and may use or disclose such information for any purpose as authorized by law.
The cover sheet of the application, and other applicant submission must be marked as follows and identify the specific pages containing trade secrets or business-sensitive, proprietary, or otherwise confidential information:
Notice of Restriction on Disclosure and Use of Data:
Pages [LIST APPLICABLE PAGES] of this document may contain trade secrets or business-sensitive, proprietary, or otherwise confidential information that is exempt from public disclosure. Such information shall be used or disclosed only for evaluation purposes or in accordance with a financial assistance agreement between the submitter and the government. The government may use or disclose any information that is not appropriately marked or otherwise restricted, regardless of source. [END OF NOTICE]
In addition, (1) the header and footer of every page that contains trade secrets or business-sensitive, proprietary, or otherwise confidential information must be marked as follows: “Contains Trade Secrets, Business-Sensitive, Proprietary, or Otherwise Confidential Information Exempt from Public Disclosure,” and (2) every line or paragraph containing such information must be clearly marked with double brackets or highlighting. DOE will make its own determination about the confidential status of the information and treat it according to its determination.
D. Notice Regarding Eligible/Ineligible Activities
Eligible activities under this NOFO include those that describe and promote the understanding of scientific and technical aspects of specific energy technologies, but not those which encourage or support political activities such as the collection and dissemination of information related to potential, planned or pending legislation.
E. Notice of Right to Conduct a Review of Financial Capability
DOE reserves the right to conduct an independent third-party review of financial capability for applicants that are selected for negotiation of award (including personal credit information of principal(s) of a small business if there is insufficient information to determine financial capability of the organization).
F. Requirement for Full and Complete Disclosure
Applicants are required to make a full and complete disclosure of all information requested. Any failure to make a full and complete disclosure of the requested information may result in:
- The cancellation of award negotiations;
- The modification, suspension, and/or cancellation of a funding agreement;
- The initiation of debarment proceedings, debarment, and/or a declaration of ineligibility for receipt of federal contracts, subcontracts, and financial assistance and benefits; and
- Civil and/or criminal penalties.
G. Retention of Submissions
DOE expects to retain copies of all applications and other submissions. By applying to DOE for funding, applicants consent to DOE’s retention of their submissions.
H. Title to Subject Inventions
Ownership of subject inventions is governed pursuant to the authorities listed below: a. Domestic Small Businesses, Educational Institutions, and Nonprofits: Under the Bayh-Dole Act (35 U.S.C. § 200 et seq.), domestic small businesses, educational institutions, and nonprofits may elect to retain title to their subject inventions.
b. Domestic Large Businesses: DOE has issued a class patent waiver that applies to this NOFO. Under this class waiver, domestic large businesses may elect title to their subject inventions similar to the right provided to the domestic small businesses, educational institutions, and nonprofits by law. To avail itself of the class waiver, a domestic large business must agree that any products embodying or produced through the use of a subject invention first conceived or first actually reduced to practice under this program will be substantially manufactured in the U.S.
c. All other parties: The Federal Non-Nuclear Energy Act of 1974, 42. U.S.C. § 5908, provides that the government obtains title to new inventions unless a patent waiver is granted. Applicants not covered by a Class Patent Waiver or the Bayh-Dole Act may request a patent waiver that will cover subject inventions that may be invented under the award, in advance of or within 30 days after the effective date of the award. Even if an advance waiver is not requested or the request is denied, the recipient will have a continuing right under the award to request a waiver for identified inventions, i.e., individual subject inventions that are disclosed to DOE within the timeframes set forth in the award’s intellectual property terms and conditions. Any patent waiver that may be granted is subject to certain terms and conditions in 10 CFR 784.
d. DEC: On June 07, 2021, DOE approved a Determination of Exceptional Circumstances (DEC) under the Bayh-Dole Act to further promote domestic manufacture of DOE science and energy technologies. In accordance with this DEC, all awards, including subawards, under the applicable NOFO Part 1 shall include the U.S. Competitiveness Provision in accordance with the U.S. Manufacturing Commitments. A copy of the DEC can be found at https://www.energy.gov/gc/determination-exceptional-circumstances-decs. Pursuant to 37 CFR 401.4, any nonprofit organization or small business firm as defined by 35 U.S.C. § 201 affected by any DEC has the right to appeal it by providing written notice to DOE within 30 working days from the time it receives a copy of the determination.
e. DOE may issue and publish further DECs on the website above prior to the issuance of awards under the applicable NOFO Part 1. DOE may require additional submissions or requirements as authorized by any applicable DEC.
I. Government Rights in Subject Inventions
Where recipients, subrecipients, and contractors retain title to subject inventions, the U.S. Government retains certain rights.
Government Use License
The U.S. Government retains a nonexclusive, nontransferable, irrevocable, paid-up license to practice or have practiced for or on behalf of the U.S. any subject invention throughout the world. This license extends to government contractors.
March-In Rights
The U.S. government retains march-in rights with respect to all subject inventions. Through “march-in rights,” the Government may require a recipient or subrecipient who has elected to retain title to a subject invention (or their assignees or exclusive licensees), to grant a license for use of the invention to a third party. In addition, the Government may grant licenses for use of the subject invention when a recipient, subrecipient, or their assignees and exclusive licensees refuse to do so.
DOE may exercise its march-in rights only if it determines that such action is necessary under any of the four following conditions:
- The owner or licensee has not taken or is not expected to take effective steps to achieve practical application of the invention within a reasonable time;
- The owner or licensee has not taken action to alleviate health or safety needs in a reasonably satisfied manner;
- The owner has not met public use requirements specified by federal statutes in a reasonably satisfied manner; or
- The U.S. manufacturing requirement has not been met.
Any determination that march-in rights are warranted must follow a fact-finding process in which the recipient has certain rights to present evidence and witnesses, confront witnesses and appear with counsel and appeal any adverse decision. To date, DOE has never exercised its march-in rights to any subject inventions.
J. Copyright
The recipient and subrecipient(s) may assert copyright in copyrightable works, such as software, first produced under the award without DOE approval. When copyright is asserted, the government retains a paid-up nonexclusive, irrevocable worldwide license to reproduce, prepare derivative works, distribute copies to the public, and to perform publicly and display publicly the copyrighted work. This license extends to contractors and others doing work on behalf of the government.
K. Export Control
The U.S. Government regulates the transfer of information, commodities, technology, and software considered to be strategically important to the U.S. to protect national security, foreign policy, and economic interests without imposing undue regulatory burdens on legitimate international trade. There is a network of federal agencies and regulations that govern exports that are collectively referred to as “Export Controls.” All recipients and subrecipients are responsible for ensuring compliance with all applicable U.S. Export Control laws and regulations relating to any work performed under a resulting award.
The recipient must immediately report to DOE any export control investigations, indictments, charges, convictions, and violations upon occurrence, at the recipient or subrecipient level, and provide the corrective action(s) to prevent future violations.
L. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment
As set forth in 2 CFR 200.216, recipients and subrecipients are prohibited from obligating or expending project funds (federal funds and recipient cost share) to procure or obtain covered telecommunications equipment or services; extend or renew a contract to procure or obtain covered telecommunications equipment or services; or enter into a contract (or extend or renew a contract) to procure or obtain covered telecommunications equipment or services. As described in Section 889 of Public Law 115-232, covered telecommunications equipment or services is telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities).
See Section 889 of Public Law 115-232, 2 CFR 200.216, and 2 CFR 200.471 for additional information.
M. Personally Identifiable Information (PII)
All information provided by the applicant must to the greatest extent possible exclude PII. “PII” refers to information that can be used to distinguish or trace an individual’s identity, such as their name, Social Security number, or biometric records, alone or combined with other personal or identifying information linked or linkable to a specific individual, such as date and place of birth or mother’s maiden name.
By way of example, applicants must screen resumes to ensure that they do not contain PII such as personal addresses, personal landline/cell phone numbers, and personal emails. Under no circumstances should Social Security numbers (SSNs) be included in the application. Federal agencies are prohibited from the collecting, using, and displaying unnecessary SSNs. (See the Federal Information Security Modernization Act of 2014 (Pub. L. No. 113-283, Dec 18, 2014; 44 U.S.C. § 3551).
N. Annual Independent Audits
If a for-profit entity is a recipient and has expended $1,000,000 or more of DOE awards during the entity’s fiscal year, an annual compliance audit performed by an independent auditor is required. For additional information, please refer to 2 CFR 910.501 and Subpart F.
If an educational institution, nonprofit organization, or state/local government is a recipient or subrecipient and has expended $1,000,000 or more of federal awards during the non-federal entity’s fiscal year, a Single or Program-Specific Audit is required. For additional information, please refer to 2 CFR 200.501 and Subpart F.
Applicants and subrecipients (if applicable) should propose sufficient costs in the project budget to cover the costs associated with the audit. DOE will share in the cost of the audit at its applicable cost share ratio.
O. Buy America Requirements for Infrastructure Projects; Required Use of American Iron, Steel, Manufactured Products, and Construction Materials Produced in the U.S.
A. Definitions
For purposes of the Buy America Requirement, the following definitions apply:
- Components -See 2 CFR 184.3 Definitions.
- Construction Materials -See 2 CFR 184.3 Definitions.
- Domestic Content Procurement Preference Requirement – means a requirement that no amount of funds made available through a program for federal financial assistance may be obligated for an infrastructure project unless—
- all iron and steel used in the project are produced in the U.S.;
- the manufactured products used in the project are produced in the U.S.; or
- the construction materials used in the project are produced in the U.S.
- Also referred to as the Buy America Requirement.
- Infrastructure -See 2 CFR 184.4(c) and (d).
- Infrastructure Project – See 2 CFR 184.3 Definitions.
- Manufactured Products – See 2 CFR 184.3 Definitions
- Predominantly of iron or steel or a combination of both -See 2 CFR 184.3 Definitions.
- Produced in the U.S. – See 2 CFR 184.3 Definitions.
- Project – means the construction, alteration, maintenance, or repair of infrastructure in the U.S.
- Public – The Buy America Requirement does not apply to non-public (private) infrastructure. For purposes of this guidance, infrastructure should be considered “public” if it is:
(1) publicly owned (owned, operated, funded and managed, in whole or in part, by any unit or authority of a Federal, State, or Local government-including U.S. Territories and Indian Tribes); or
(2) privately owned but utilized primarily for a public purpose. Infrastructure should be considered to be “utilized primarily for a public purpose”, and therefore “public”, if it is privately owned but operated on behalf of the public or is a place of public accommodation. - Section 70917(c) Materials – See 2 CFR 184.3 Definitions.
B. Buy America Requirement for Infrastructure Projects (Buy America Requirement)
None of the award funds (includes federal share and recipient cost share) may be used for a project for infrastructure unless:
- all iron and steel used in the project is produced in the U.S.—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the U.S.;
- all manufactured products used in the project are produced in the U.S.—this means the manufactured product was manufactured in the U.S.; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the U.S. is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation. See 2 CFR 184.5 for determining the cost of components for manufactured products; and
- all construction materials4 are manufactured in the U.S.—this means that all manufacturing processes for the construction material occurred in the U.S. See 2 CFR 184.6 for construction material standards.
The Buy America Requirement only applies to those articles, materials, and supplies that are consumed in, incorporated into, or affixed to the infrastructure in the project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does the Buy America Requirement apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.
The Buy America Requirement only applies to an article, material, or supply classified into one of the following categories* based on its status at the time it is brought to the work site for incorporation into an infrastructure project: (i) Iron or steel products; (ii) Manufactured products; or (iii) Construction materials;
The Buy America Requirement only applies to the iron or steel products, manufactured products, and construction materials used for the construction, alteration, maintenance, or repair of public infrastructure in the U.S. when those items are consumed in, incorporated into, or permanently affixed to the infrastructure. An article, material, or supply incorporated into an infrastructure project should not be considered to fall into multiple categories, but rather must meet the Buy America Preference Requirement for only the single category in which it is classified.
All iron and steel, manufactured products, and construction materials used in the infrastructure project must be produced in the U.S.
- Section 70917(c) Materials are cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives as provided in section 70917(c) of BABA. Section 70917(c) materials are excluded from Construction materials. Asphalt concrete pavement mixes are typically composed of asphalt cement (a binding agent) and aggregates such as stone, sand, and gravel. Accordingly, asphalt is also excluded from the definition of Construction materials.
Section 70917 (c) materials, on their own, are not manufactured products. Further, Section 70917(c) materials should not be considered manufactured products when they are used at or combined proximate to the work site—such as is the case with wet concrete or hot mix asphalt brought to the work site for incorporation. However, certain Section 70917(c) materials (such as stone, sand, and gravel) may be used to produce a manufactured product, such as is precast concrete. Precast concrete is made of components, is processed into a specific shape or form, and is in such state when brought to the work site. Furthermore, wet concrete should not be considered a manufactured product if not dried or set prior to reaching the work site.
Further clarification is provided in 2 CFR 184 on the circumstances under which a determination is made that Section 70917(c) materials should be treated as components of a manufactured product. That determination is based on consideration of: (i) the revised definition of the “manufactured products” at 2 CFR 184.3; (ii) a new definition of “section 70917(c) materials” at 2 CFR 184.3; (iii) new instructions at 2 CFR 184.4(e) on how and when to categorize articles, materials, and supplies; and (iv) new instructions at 2 CFR 184.4(f) on how to apply the Buy America preference by category.
The Buy America Requirement does not statutorily apply to Prime Recipients that are For-Profit Entities. However, the Buy America Requirement is applicable to a For-Profit Entity if:
- it is a sub-recipient or sub-awardee under an award that contains the Buy America Requirement term and condition, or
- it is the Prime Recipient that voluntarily chooses to use domestically sourced iron, steel, manufactured products, and constructions materials by stating so in its proposed application containing an infrastructure project.
If the For-Profit Entity specifically states that it will comply with the Buy America Requirements in its application and it is selected for award, its award will contain a Buy America Requirement for Infrastructure Projects term and condition.
The Prime Recipient is responsible for flowing the Buy America Requirement down to all sub-awards, all contracts, subcontracts, and purchase orders for work performed under the proposed infrastructure project, including to For-Profit Entities when the For-Profit Entity is a sub-recipient or sub-awardee.
Recipients must certify or provide equivalent documentation for proof of compliance that a good faith effort was made to solicit bids for domestic products used in the infrastructure project under this award.
Recipients must also maintain certifications or equivalent documentation for proof of compliance that those articles, materials, and supplies that are consumed in, incorporated into, affixed to, or otherwise used in the infrastructure project, not covered by an approved waiver or an exemption provided in 2 CFR 184.8, are produced in the U.S. The certification or proof of compliance must be provided by the suppliers or manufacturers of the iron, steel, manufactured products and construction materials and flow up from all subawardees, contractors and vendors to the recipient. Recipients must keep these certifications with the award/project files and be able to produce them upon request from DOE, auditors or Office of Inspector General.
C. DOE Submission Requirements for Full Application
Within the first two pages of the workplan or project description, applicants must provide a short statement on whether the project will involve the construction, alteration, maintenance and/or repair of infrastructure in the U.S. The ultimate determination about whether a project includes infrastructure remains with DOE, but the applicant’s statement will assist project planning and integration of the Buy America Requirement, which may impact the project’s proposed budget and/or schedule.
D. Waivers
In limited circumstances, DOE may waive the application of the Buy America Requirement in an award where DOE determines that:
- applying the Buy America requirements would be inconsistent with the public interest (Public Interest);
- the types of iron, steel, manufactured products, or construction materials are not produced in the U.S. in sufficient and reasonably available quantities or of a satisfactory quality (Non-Availability); or
- the inclusion of iron, steel, manufactured products, or construction materials produced in the U.S. will increase the cost of the overall project by more than 25 percent (Unreasonable Cost).
DOE will only process waiver requests after an award has been made and for which the requests have been submitted in accordance with the term and conditions of the award. Waiver requests must be reviewed by DOE and the Office of Management and Budget’s (OMB) Made in America Office and are subject to a public comment period of no less than 15 calendar days.
Waiver Requests may be submitted utilizing Optional Form 2211 (OF2211) or any other format to provide the required information below. DOE or OMB may request additional information for consideration of the wavier. DOE may reject or grant waivers in whole or in part depending on its review, analysis, and/or feedback from OMB or the public. DOE’s final determination regarding approval or rejection of the waiver request may not be appealed by a Recipient. The waiver request review and public comment process required for a waiver determination can take up to 65 calendar days.
Requests to waive the Buy America Requirement must include the following:
- Waiver type (Public Interest, Non-Availability, or Unreasonable Cost);
- Recipient name and Unique Entity Identifier (UEI);
- Award information (Federal Award Identification Number, Assistance Listing number);
- A brief description of the award- project objectives, location, and the specific infrastructure project involved;
- Total estimated Financial Assistance award value, inclusive of recipient cost share;
- Total estimated infrastructure costs (estimated costs of the Iron, Steel, Manufactured Products and Construction Materials being purchased under the award and utilized in the infrastructure project);
- List and description of iron or steel item(s), manufactured goods, and/or construction material(s) the recipient seeks to waive from the Buy America Requirement, including name, cost, quantity(ies), country(ies) of origin, and relevant Product Service Codes (PSC) and North American Industry Classification System (NAICS) codes for each;
- A detailed justification as to how the non-domestic item(s) is/are essential the project;
- A certification that the recipient made a good faith effort to solicit bids for domestic products supported by terms included in requests for proposals, contracts, and non-proprietary communications with potential suppliers;
- A justification statement—based on one of the applicable justifications outlined above—as to why the listed items cannot be procured domestically, including the due diligence performed (e.g., market research, industry outreach, cost analysis, cost-benefit analysis) by the recipient to attempt to avoid the need for a waiver. This justification may cite, if applicable, the absence of any Buy America-compliant bids received for domestic products in response to a solicitation; A description of the market research conducted that includes who conducted the market research, when it was conducted, sources that were used, and the methods used to conduct the research; and
- Anticipated impact to the project if no waiver is issued.
The following principles should be incorporated as minimum requirements in waiver request:
- Time-limited: Consider a waiver constrained principally by a length of time, or phased-out over time, rather than by the specific project/award to which it applies. Waivers of this type may be appropriate, for example, when an item that is “non-available” is widely used in the project. When requesting such a waiver, the recipient should identify a reasonable, definite time frame (e.g., no more than one to two years) designed so that the waiver is reviewed to ensure the condition for the waiver (“non-availability”) has not changed (e.g., domestic supplies have become more available).
- Targeted: Waiver requests should apply only to the item(s), product(s), or material(s) or category(ies) of item(s), product(s), or material(s) as necessary and justified. Waivers should not be overly broad as this will undermine domestic preference policies.
- Conditional: The recipient may request a waiver with specific conditions that support the policies of IIJA/BABA and Executive Order 14017.
P. Acronyms
| Acronym | Spelled Out |
|---|---|
| ANC | Alaska Native Corporation |
| BABA | Build America, Buy America Act |
| COI | Conflict of Interest |
| CRADA | Cooperative Research and Development Agreement |
| DBA | Davis-Bacon Act |
| DEC | Determination of Exceptional Circumstances |
| DMP | Data Management Plan |
| DOE | United States Department of Energy |
| DOI | Digital Object Identifier |
| DOL | United States Department of Labor |
| EO | Executive Order |
| FCOI | Financial Conflicts of Interest |
| FFATA | Federal Funding and Transparency Act of 2006 |
| FFRDC | Federally Funded Research and Development Center |
| IIJA | Infrastructure and Investment Jobs Act |
| IRA | Inflation Reduction Act |
| NDA | Non-Disclosure Acknowledgement |
| NE | Office of Nuclear Energy |
| NEPA | National Environmental Policy Act |
| NEUP | Nuclear Energy University Program |
| NHPA | National Historic Preservation Act |
| NOFO | Notice of Funding Opportunity |
| NSF | National Science Foundation |
| NSUF | Nuclear Science User Facilities |
| OFCCP | Office of Federal Contractor Compliance Programs |
| OIG | Office of Inspector General |
| OMB | Office of Management and Budget |
| OTA | Other Transactions Authority |
| PII | Personally Identifiable Information |
| RD&D | Research, Development, and Demonstration |
| RTES | Research, Technology, and Economic Security |
| SAM | System for Award Management |
| SciENcv | Science Experts Network Curriculum Vita |
| SMART | Specific, Measurable, Achievable, Relevant, and Timely |
| SOPO | Statement of Project Objectives |
| STEM | Science, Technology, Engineering, and Mathematics |
| UCC | Uniform Commercial Code |
| UEI | Unique Entity Identifier |
| WP | Work Proposal |
FY26 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research (CINR Infrastructure NOFO) — Part 1
Financial Assistance
Notice of Funding Opportunity
Department of Energy (DOE) Idaho Operations Office
Fiscal Year 2026 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research
Notice of Funding Opportunity Number: DE-FOA-0003541
Application due: April 9, 2026, at 5:00 p.m. Eastern Time
Modifications to this NOFO will be posted on NEUP.gov and Grants.gov. Grants.gov will automatically notify applicants when a NOFO modification is processed. Applicants must be registered to this NOFO in Grants.gov to receive email notifications. See Registration Requirements in Part 2 of this NOFO.
Before You Begin
Navigating the Notice of Funding Opportunity
To reduce the burden on applicants in the Notice of Funding Opportunity (NOFO) process and limit the length of the NOFO information requests, DOE has separated the NOFO into two parts.
- The NOFO Part 1 describes the specific DOE programmatic goals and evaluation criteria, eligibility, and other components that are specific to each funding opportunity.
- The NOFO Part 2 includes the fixed DOE requirements that generally do not change from NOFO to NOFO, including standard information for the application phase, expectations for award negotiations, and post-award requirements.
Applicants must review both the NOFO Part 1 and the NOFO Part 2 prior to applying. To facilitate navigation, you will find links throughout this document to additional information found in Part 2.
There are several required one-time actions applicants must take before applying to this NOFO. Some of these actions may take several weeks, so it is vital applicants build in enough time to complete them. Failure to complete these actions could interfere with application or negotiation deadlines or the ability to receive an award if selected. If you have previously completed the necessary registrations, make sure your registration is active and up to date. All registrations are free. Please refer to NOFO Part 2, Get Registered, for additional information.
This announcement is published in conjunction with NOFO Part 2 Version 2.0.
I. Basic Information
A. Key Facts
- Issuing Agency: Department of Energy, Idaho Operations Office
- Funding Opportunity Title: Fiscal Year 2026 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research
- Announcement Type: Initial
- Funding Opportunity Number: DE-FOA-003541
- Funding Instrument: Grant
- Grant Assistance Listing Number: 81.121
- Funding Opportunity Description: This Notice of Funding Opportunity (NOFO) is for Scientific Infrastructure Support for Consolidated Innovative Nuclear Research. It is referred to in this document as the “CINR Infrastructure NOFO.”
Program Goals & Objective(s)
The goals of this NOFO include:
- Supporting, maintaining, or enhancing an institution’s capacities to attract and teach high quality students interested in nuclear energy-related studies;
- building an institution’s research or education capabilities; and
- enhancing an institution’s capabilities to perform R&D that is relevant to NE’s broader mission.
The objectives of this NOFO shall establish and/or enhance nuclear research capabilities at U.S. universities and colleges, especially in support of:
- Upgrading and improving U.S. university nuclear research and training reactors;
- Obtaining equipment and instrumentation that significantly improves or expands the research, instruction, training capabilities, and/or operating capabilities; and
- Contributing to strengthening the academic community’s nuclear engineering infrastructure.
KEY DATES
- Notice of Funding Opportunity Issue Date: December 15, 2025
- Application Deadline: April 9, 2026
- Anticipated Selection Notification Date: September 30, 2026
- Anticipated Award Date: February 1, 2027
- Estimated Period of Performance: Anticipate 1 year
Topic Areas
- Topic Area 1: Reactor Upgrades (RU)
- Topic Area 2: General Scientific Infrastructure (GSI)
Eligible Applicants
In accordance with 2 CFR 910.126 (b), Competition, DOE is restricting applicant eligibility for this NOFO to:
- Specific U.S. Universities and Colleges with a research reactor (listed in the table below) under Topic Area 1: Reactor Upgrades (RU)
- All U.S. Universities and Colleges under Topic Area 2: General Scientific Infrastructure (GSI)
| # | University | # | University |
|---|---|---|---|
| 1 | Idaho State University | 13 | The Ohio State University |
| 2 | Kansas State University | 14 | University of California, Davis |
| 3 | Massachusetts Institute of Technology | 15 | University of California, Irvine |
| 4 | Missouri University of Science & Technology | 16 | University of Florida |
| 5 | North Carolina State University | 17 | University of Maryland, College Park |
| 6 | Oregon State University | 18 | University of Massachusetts, Lowell |
| 7 | Pennsylvania State University | 19 | University of Missouri, Columbia |
| 8 | Purdue University | 20 | University of New Mexico |
| 9 | Reed College | 21 | University of Texas at Austin |
| 10 | Rensselaer Polytechnic Institute | 22 | University of Utah |
| 11 | Rhode Island Nuclear Science Center | 23 | University of Wisconsin, Madison |
| 12 | Texas A&M University | 24 | Washington State University |
Application Site and Helpdesk
- Application Site: https://proposals.inl.gov
- Helpdesk: NEUP@inl.gov
1. Funding Details
Multiple Topic Areas
- Approximate total available funding including all topic areas: $5,000,000 in FY 2026.
Topic Area 1: University Research Reactor Upgrades (RU) Infrastructure Support
- Approximate total available funding: $2,500,000 in FY 2026
- Approximate number of awards: 3 to 5
- Approximate dollar amount of individual awards: $0 - $1,500,000
- Minimum cost share required: Cost Sharing is not required, but is encouraged
- Approximate award project period: 12 months (longer project periods are allowable)
- Anticipated length of budget periods: 12 months
Topic Area 2: General Scientific Infrastructure (GSI) Support for Universities
- Approximate total available funding: $2,500,000 in FY 2026
- Approximate number of awards: no less than 1 to 10
- Approximate dollar amount of individual awards: $250,000
- Minimum cost share required: Cost Sharing is not required, but is encouraged, for requests less than or equal to $250,000; a 1-to-1 Cost Match is required for requests greater than $250,000
- Approximate award project period: 12 months (longer project periods are allowable)
- Anticipated length of budget periods: 12 months
DOE reserves the right to make more or fewer (or even no awards) depending on funding availability and/or the quality of the applications.
2. Period of Performance
DOE anticipates making awards with an estimated project performance period of 1 year, beginning February 1, 2027. Additional time, if needed, may be requested, and justified in the application.
B. Executive Summary
The development of nuclear energy-related infrastructure and basic capabilities in the research community is necessary to promote Research and Development (R&D) that supports nuclear science and engineering (NS&E), the Office of Nuclear Energy (NE) mission, and the nation’s nuclear energy challenges. Through the Nuclear Energy University Program (NEUP), the Department of Energy (DOE) intends to facilitate the education and training of nuclear scientists, engineers, and policymakers through graduate and undergraduate study, two-year programs, and R&D that is relevant to the NE and the U.S. nuclear energy industry in general.
The specific goals of the Scientific Infrastructure Support for Consolidated Innovative Nuclear Research NOFO (referred to as “CINR Infrastructure NOFO”) are:
- To support, maintain, or enhance the institution’s capacities to attract and teach high quality students interested in nuclear energy-related studies;
- Build the institution’s research or education capabilities; and
- Enhance the institution’s capabilities to perform R&D that is relevant to NE’s mission.
The following targeted objectives within this CINR Infrastructure NOFO will aid in achieving these goals:
- Upgrade and improve U.S. university nuclear research and training reactors. Upgrades for a research reactor that include the acquisition of equipment and/or instrumentation for activities related to safety, performance, control, or operational reliability. For example, equipment acquired for security/safety enhancements required by the federal/state/local regulatory agencies are permitted.
- Obtain equipment and instrumentation that significantly improves or expands the research, instruction, training capabilities, and/or operating capabilities related to NE program missions (e.g., utilization or handling of radiological or radioactive materials). For example, this may include radiation detection and measurement equipment.
- Contribute to strengthening the academic community’s nuclear engineering infrastructure.
Requests should focus on individual, discrete, definable items, or capabilities. An applicant must demonstrate the educational or R&D connection between requested pieces of equipment to support the NE mission. Applications made of several uncorrelated equipment requests are not of interest. Additionally, requests should not result in the duplication of existing capabilities. To review existing NE R&D capabilities in the U.S., refer to the Nuclear Energy Infrastructure Database (NEID), available at https://nsuf.inl.gov under Resources (account login required). Information on current NE research programs can be found at NE’s website: https://energy.gov/ne.
C. Agency Contact Information
U.S. Department of Energy
Idaho Operations Office
1955 Fremont Avenue
Idaho Falls, ID 83415
For questions relating to this specific NOFO, please send emails to NEUP@inl.gov.
DISCLAIMER: Applicants are discouraged from submitting information considered proprietary unless it is deemed essential for proper evaluation of the application. If the application contains information that the applicant organization considers to be trade secrets, information that is commercial or financial, or information that is privileged or confidential, the pages containing that information must be identified as specified in the application instructions. When such information is included in the application, it will be withheld from public disclosure to the extent permitted by law, including the Freedom of Information Act, with the understanding that the information will be used or disclosed only for evaluation of the application. The information contained in the application will be protected by DOE from unauthorized disclosure, consistent with the need for merit review of applications of financial assistance awards to assure the integrity of the competitive process and the accuracy and completeness of the information. If a federal financial assistance award is made as a result of or in connection with an application, the federal government has the right to use or disclose the information to the extent authorized by law. This restriction does not limit the Federal Government’s right to use the information if it is obtained without restriction from another source.
II. Eligibility
To be considered for substantive evaluation, an applicant’s submission must meet the criteria set forth below. If the application does not meet these eligibility requirements, it will be considered ineligible and removed from further evaluation and ineligible for any award. DOE will not make eligibility determinations for potential applicants prior to the date on which applications to this NOFO must be submitted. The decision whether to apply in response to this NOFO lies solely with the applicant. The information included here is specific to eligibility requirements for this NOFO. For eligibility requirements applicable to all NOFOs, please consult the NOFO Part 2, Eligibility.
A. Eligible Applicants
To be considered for substantive evaluation, an applicant’s submission must meet the criteria set forth below. If the application does not meet these eligibility requirements, it will be considered ineligible and removed from further evaluation.
1. Restricted Eligibility
In accordance with 2 CFR 910.126 (b), Competition, DOE is restricting applicant eligibility for this NOFO as follows:
- Topic Area 1: Reactor Upgrades (RU): Specific U.S. Universities and Colleges1 with a research reactor (listed below) are eligible to submit applications for Topic Area 1. This restriction ensures the NEUP supports the continued safe and secure operations of university research reactors in support of university research, collaborations with industry and national laboratories, and training and educating the next generation nuclear workforce.
| # | University |
|---|---|
| 1 | Idaho State University |
| 2 | Kansas State University |
| 3 | Massachusetts Institute of Technology |
| 4 | Missouri University of Science & Technology |
| 5 | North Carolina State University |
| 6 | Oregon State University |
| 7 | Pennsylvania State University |
| 8 | Purdue University |
| 9 | Reed College |
| 10 | Rensselaer Polytechnic Institute |
| 11 | Rhode Island Nuclear Science Center |
| 12 | Texas A&M University |
| 13 | The Ohio State University |
| 14 | University of California, Davis |
| 15 | University of California, Irvine |
| 16 | University of Florida |
| 17 | University of Maryland, College Park |
| 18 | University of Massachusetts, Lowell |
| 19 | University of Missouri, Columbia |
| 20 | University of New Mexico |
| 21 | University of Texas at Austin |
| 22 | University of Utah |
| 23 | University of Wisconsin, Madison |
| 24 | Washington State University |
1 “U.S. Universities and Colleges” is defined consistent with the meaning of “institution of higher education” as set forth in 20 U.S.C. 1001(a).
- Topic Area 2: General Scientific Infrastructure (GSI): All institutions of higher education2 are eligible to submit applications for Topic Area 2. This restriction ensures the NEUP supports university research, collaborations with industry and national laboratories, and training and educating the next generation nuclear workforce.
2 “Institution of higher education” is defined in 34 CFR 600.4. https://www.ecfr.gov/current/title-34/subtitle-B/chapter-VI/part-600/subpart-A/section-600.4
2. Domestic Entities
Domestic entities are eligible to apply as recipients. The following types of domestic entities are eligible to participate as a prime recipient of this NOFO:
- U.S. Universities and Colleges.
There are no subrecipients allowed for this NOFO, as defined by 2 CFR 200.331.
To qualify as a domestic entity, the entity must be organized, chartered, or incorporated (or otherwise formed) under the laws of a particular state or territory of the United States or under the laws of the United States; have majority domestic ownership and control; and have a physical place of business in the United States.
3. Foreign Entity Participation
Foreign entities are not eligible to apply as a prime recipient. No U.S. Government funding will be provided to entities incorporated outside of the U.S. or to a foreign government or any entity owned or controlled by a foreign government. Foreign government ownership means direct ownership of the applicant entity, its parent organization (e.g., trust, holding company, corporation, etc.), and any and all other entities in the corporate structure regardless of the applicant entity’s place of incorporation and operation. NE will evaluate the benefit and contribution of any such proposed partnerships as part of its evaluation of the relevancy to the NE mission.
4. Participant Limitations
DOE FFRDCs3, Non-DOE FFRDCs, and Federal agencies and instrumentalities are not eligible to apply as a recipient.
3 FFRDCs are public-private partnerships that conduct research for the U.S. Government. A listing of FFRDCs can be found at http://www.nsf.gov/statistics/ffrdclist/.
5. Performance of Work in the U.S.
All work for awards under this NOFO must be performed in the U.S.
6. Ineligible Participants
The following entities are ineligible for participation in this NOFO as a recipient or subcontractor.
- In accordance with 2 CFR 200.214, entities banned from doing business with the U.S. Government such as entities debarred, suspended, or otherwise excluded from or ineligible for participating in federal programs.
- Entities identified on Department of the Treasury Office of Foreign Assets Control Treasury’s Sanctions Program Specially Designated Nationals list are prohibited from doing business with the U.S. Government and are not eligible. See OFAC - Sanctions List Service (https://sanctionslist.ofac.treas.gov/Home/SdnList).
- Nonprofit organizations described in Section 501(c)(4) of the Internal Revenue Code of 1986 that engaged in lobbying activities after December 31, 1995, are not eligible to apply for funding.
7. Entity of Concern Prohibition
Entities of Concern are prohibited from participating in projects selected under this NOFO (see NOFO Part 2, Eligibility, Other Eligibility Information, Entity of Concern Prohibition section for details and definitions).
B. Limitation on Number of Applications Eligible for Review
Topic Area 1: Reactor Upgrades (RU)
An eligible applicant may submit only one application to this topic area per research reactor for this NOFO. If an entity submits more than one full application, the DOE will only review the last submission.
Topic Area 2: General Scientific Infrastructure (GSI)
An eligible applicant may submit only one application to this topic area. If an entity submits more than one full application, the DOE will only review the last submission.
C. Cost Sharing
Applicants are expected to follow through on estimated cost share commitments proposed in their applications if selected for award negotiations. Please refer to the NOFO Part 2, Eligibility for more information on Cost Sharing.
1. Cost Share Requirements
If cost share is proposed under this NOFO, the cost share must come from non-federal sources unless otherwise allowed by law.
Topic Area 1: RU
Cost sharing is encouraged but not required for this topic area. Any cost sharing proposal must be included in the application. Applicants are bound by the cost share proposed in their application if selected for award negotiations.
Topic Area 2: GSI
Cost sharing is required for applications that propose project costs that exceed $250,000 on a 50% (e.g., 1-to-1 cost match) basis for every dollar above $250,000. For applications requesting less than $250,000 in total project costs, cost sharing is encouraged but not required. Any cost sharing proposal must be included in the application. Applications that do not meet the minimum required cost share will be deemed ineligible during the initial compliance review and will not be further reviewed. Applicants are bound by the cost share proposed in their application if selected for award negotiations.
If cost-share is proposed, the cost share must come from non-federal sources unless otherwise allowed by law. The cost share percentage is calculated by dividing the cost share by the total allowable project costs for the award where the total allowable project costs include government share and cost share
To help applicants calculate proper cost share amounts, DOE has included a cost share information sheet and sample cost share calculation in the NOFO Part 2, Eligibility—Cost Sharing, Cost Share Calculation Examples.
2. Unallowable Cost Share Sources
The unallowable cost share sources identified here are specific to this announcement. Refer to NOFO Part 2, Eligibility-Cost Sharing, Unallowable Cost Share Sources for unallowable cost share sources applicable to all NOFOs.
D. FFRDC Eligibility Criteria
DOE AND Non-DOE FFRDCs are not eligible to participate as a recipient or subrecipient.
III. Program Description
A. Program Purpose
The Office of Nuclear Energy’s (NE) program purpose is to advance nuclear energy science and technology to meet U.S. energy, environmental and economic needs. NE enables innovation, supports unique research infrastructure, and solves crosscutting challenges facing the nuclear energy sector through research, development and demonstration. NE has identified the following goals to address challenges in the nuclear energy sector, help realize the potential of advanced technology, and leverage the unique role of the government in spurring innovation:
- Enable continued operation of existing U.S. nuclear reactors.
- Enable deployment of advanced nuclear reactors.
- Develop advanced nuclear fuel cycles.
- Maintain U.S. leadership in nuclear energy technology.
Investing in the next generation of nuclear energy leaders and advancing university-led nuclear innovation is vital to fulfilling NE's mission, which is primarily accomplished through NE’s Nuclear Energy University Program (NEUP). NEUP was established in 2009 to consolidate NE’s university support and enable the integration of university research within NE’s technical programs. Through various competitive award opportunities, the program engages with U.S. universities and colleges to conduct research and development (R&D), enhance infrastructure, and support student education, thereby contributing to the development of a world-class nuclear energy and workforce capability.
B. Program Goals and Objectives
DOE has initiated a priority effort to develop and maintain a national R&D framework to achieve NE’s missions, requiring an integrated approach involving people, tools, facilities, and knowledge, tied to strategic partnerships. Experimental infrastructure (i.e., tools and facilities) is a critical piece of this framework. The development of nuclear energy-related infrastructure and basic capabilities in the research community is necessary to promote R&D that supports nuclear science and engineering (NS&E), NE’s mission, and the nation’s nuclear energy challenges. Accordingly, the Nuclear Energy University Program (NEUP) intends to facilitate the education and training of nuclear scientists, engineers, and policymakers through graduate and undergraduate study, two-year programs, and R&D that is relevant to the DOE and the U.S. nuclear energy industry in general.
This NOFO is seeking applications that address the following key goals:
- Supporting, maintaining, or enhancing an institution’s capacities to attract and teach high quality students interested in nuclear energy-related studies;
- Build an institution’s research or education capabilities; and
- Enhancing an institution’s capabilities to perform R&D that is relevant to NE’s broader mission.
The objectives of this NOFO are to establish and/or enhance nuclear research capabilities at U.S. universities and colleges, especially in support of:
- Upgrade and improve U.S. university nuclear research and training reactors. Upgrades for a research reactor that include the acquisition of equipment and/or instrumentation for activities related to safety, performance, control, or operational reliability. For example, equipment acquired for security/safety enhancements required by the federal/state/local regulatory agencies are permitted.
- Obtain equipment and instrumentation that significantly improves or expands the research, instruction, training capabilities, and/or operating capabilities related to NE program missions (e.g., utilization or handling of radiological or radioactive materials). For example, this may include radiation detection and measurement equipment.
- Contribute to strengthening the academic community’s nuclear engineering infrastructure.
C. Expected Performance Goals
Applications for both Topic Areas should focus on individual, discrete, definable items, or capabilities. An applicant must demonstrate the educational or R&D connection between requested pieces of equipment toward a key objective or outcome in support of the NE mission. Applications made of several uncorrelated equipment requests are not of interest. Additionally, requests should not result in the duplication of existing capabilities. To review existing NE R&D capabilities in the U.S., refer to the Nuclear Energy Infrastructure Database (NEID), available at https://nsuf.inl.gov under Resources (account login required). Information on current NE research programs can be found at NE’s website: https://energy.gov/ne.
Specific quantitative performance goals are dependent on each eligible applicant’s proposed capabilities. However, the expected qualitative performance goals for each Topic Area are as follows:
Topic Area 1: Reactor Upgrades (RU)
- Improvements to the safety, security, and operational reliability of university research reactors. Applications addressing those needs will be given highest priority.
- Procurement of spare parts and associated hardware for research reactor control consoles. These systems are vital for continued safe and reliable reactor operation. Replacements often take months from order to delivery. Applications to support the continued long-term operation of the university research reactor by purchasing spare parts, subsystems, channels, and detectors are encouraged.
- Procurement of reactor infrastructure that supports the sharing and use of equipment and instrumentation by multiple campuses of a university or multiple universities is encouraged.
Topic Area 2: General Scientific Infrastructure (GSI)
- Procurement of equipment, software, instrumentation, and associated non-reactor upgrade requests that support nuclear energy-related R&D or education.
- Procurement of equipment and instrumentation for specialized facilities, classrooms, and teaching laboratories, and non-reactor NS&E research.
- Procurement of infrastructure that supports the sharing and use of equipment and instrumentation by multiple campuses of a university, multiple universities, or with national laboratories is encouraged.
- Procurement of infrastructure that supports existing or future Nuclear Science User Facilities (NSUF) capabilities at institutions of higher education is encouraged.
NE reserves the right to respond to potential shifts in priorities that may be driven by events, policy developments, or Congressional/budget direction. NE will factor such considerations into decisions related to the timing and scale of award announcements associated with this NOFO.
D. Topic Areas
- Topic Area 1: Reactor Upgrades (RU)
- Topic Area 2: General Scientific Infrastructure (GSI)
E. Applications Specifically Not of Interest
The following types of applications will be deemed nonresponsive and will not be reviewed or considered (Please also refer to the Responsiveness Review section below):
- Applications that fall outside the technical parameters specified in the Program Goals and Objectives section above
- Applications including several uncorrelated equipment procurement, installation and/or upgrade requests
- Applications that describe performing actions that result in duplicating existing capabilities
- Applications involving the planning or construction of new university nuclear reactors will not be considered
- Applications including costs for the following activities will not be allowed:
- Routine operation and maintenance of equipment
- Upgrades to increase operational profit or support for commercial activities
- Indirect costs for the 50% of the budget that must go to equipment and upgrades (e.g., physical infrastructure/equipment)
- Applications focused specifically in areas not of interest to the NE mission, such as fusion energy, medical physics, nuclear forensics, or environmental management
- Applications submitted under Topic Area 1: RU requesting equipment and associated upgrades not directly related to the eligible applicant’s research reactor.
- Applications submitted under Topic Area 2: GSI requesting equipment and associated upgrades directly related to the eligible applicant’s research reactor.
F. Statutory Authority
The programmatic authorizing statute is Section 951(a) of the Energy Policy Act of 2005, as codified at 42 U.S.C. § 16271(a). Additionally, 42 U.S.C. § 16274 and 31 U.S.C. § 6304 apply to this NOFO.
Awards made under this announcement will fall under the purview of 2 CFR Part 200 as adopted and supplemented by 2 CFR Part 910.
IV. Application Content and Form
This section includes application information specific to this NOFO Part 1. Refer to the NOFO Part 2, Application Content and Form for standard information that applies to all DOE NOFOs such as formatting and content requirements, and funding restrictions.
A. Summary
The application process includes one submission phase: Full Application. Neither letters of intent nor concept papers are required.
Application Submission Phase Eligibility for Submission
- Application Must be submitted by the specified due date and time to be eligible for comprehensive merit review.
B. Application Content Requirements
Each application must be limited to a single concept. Applications must conform to the following requirements and must not exceed the stated page limits. Please refer to the NOFO Part 2, Application Content and Form for a complete list of application requirements. Detailed guidance on the content and form of NOFO-specific requirements is provided following the Summary of Application Requirements table below.
1. Covered Individual Definition, Designation, and Responsibility
Several of the Application Content Requirements listed below and in the NOFO Part 2 are required of covered individuals.
For the purposes of this NOFO, a Covered Individual means an individual who (a) contributes in a substantive, meaningful way to the development or execution of the scope of work of a project proposed for funding by DOE, and (b) is designated as a covered individual by DOE. Often, these individuals have doctoral or other professional degrees, although individuals at the master’s level may be considered covered individuals if their involvement meets this definition. Consultants, graduate students, and those with a postdoctoral role also may be considered covered individuals if they meet this definition.
DOE designates as covered individuals any principal investigator (PI); project director (PD); co-principal investigator (Co-PI); co-project director (Co-PD); project manager; and any individual regardless of title that is functionally performing as a PI, PD, Co-PI, Co-PD, or project manager.
The applicant is responsible for assessing the applicability of (a) above, against each person listed on the application. Further, the applicant is responsible for identifying any such individual to DOE for designation as a covered individual, if not already designated by DOE as described above.
The applicant’s submission of a current and pending support disclosure and/or biosketch/resume for a particular person serves as an acknowledgement that DOE designates that person as a covered individual.
DOE may further designate covered individuals during award negotiations or the award period of performance.
2. Summary of Application Requirements
| Component | File Format | Page Limit | File Name |
|---|---|---|---|
| Conflict of Interest Acknowledgement | N/A | n/a | Checkbox acknowledgement |
| Application for Federal Assistance (SF-424) | n/a | FY26 SF424 [TRACKING ID#].pdf | |
| Project/Performance Site Location(s) | n/a | FY26 LOW [TRACKING ID#].pdf | |
| Project Summary/Abstract | 1 | FY26 Abstract [TRACKING ID#].pdf | |
| Project Summary Slide | 1 | FY26 Slide [TRACKING ID#].pdf | |
| Technical Volume (previously referred to as Project Narrative) | 8 pages | FY26 Technical Volume [TRACKING ID#].pdf | |
| Resumes (for each covered individual) | 3 pages each | FY26 Resume [LAST NAME] [TRACKING ID#].pdf | |
| Budget Information Non-Construction Programs (SF-424A) | MS Excel | n/a | FY26 Budget SF424A [TRACKING ID#].pdf |
| Cost Sharing Letters of Commitment | 1 page each | FY26 Cost Share LOCs [TRACKING ID#].pdf | |
| Budget Justification | n/a | FY26 Budget Justification [TRACKING ID#].pdf | |
| Vendor Quotes | n/a | FY26 Vendor Quotes [TRACKING ID#].pdf | |
| Current & Pending Support (for each covered individual) | n/a | FY26 Support [TRACKING ID#].pdf | |
| Potentially Duplicative Funding Notice | n/a | FY26 PDFN [TRACKING ID#].pdf | |
| Lobbying Activities (SF-LLL) (if applicable) | n/a | FY26 SF-LLL [TRACKING ID#].pdf | |
| Transparency of Foreign Connections | n/a | FY26 TFC [TRACKING ID#].pdf | |
| Impacted Indian Tribe Documentation PDF | n/a | FY26 Impacted Indian Tribes [TRACKING ID#].pdf |
3. Technical Volume
The Technical Volume must conform to the following content and form requirements. This volume must address the technical review criteria as discussed in the Technical Review Criteria section below.
Applicants must provide sufficient citations and references to justify the claims and approaches made in the Technical Volume (e.g., specific reactor Technical Specifications, 10 CFR 50.59 justifications, etc.). However, DOE and reviewers are under no obligation to review cited sources.
The Technical Volume to the application may not be more than 8 pages, including the cover page, table of contents, and all citations, charts, graphs, maps, photos, or other graphics, and must include all information below. The applicant should consider the weighting of each of the technical review criteria (see Technical Review Criteria section) when preparing the Technical Volume.
Technical Volume Content Requirements Overview
| Section | Approximate Percent Content of the Technical Volume |
|---|---|
| Cover Page and Table of Contents | N/A |
| Buy America Requirements for Infrastructure Projects | N/A |
| Project Goals and Objectives | 30% |
| Schedule and Task Descriptions | 40% |
| Relevance and Outcomes/Impacts | 20% |
| Roles of Participants | 5% |
| Facilities, Complementary Equipment, and Other Resources | 5% |
NOTE: Each technical review criterion is identified in the following recommended (but not required) technical volume outline and content percentages by volume below.
(1) Cover Page: The cover page must include all the following:
- The project title;
- Specific NOFO topic areas (if applicable);
- Technical and business POCs (e-mail addresses and telephone numbers);
- The project team, including the names of the PI and key personnel, entity type and names of all team member organizations where applicable;
- The project location(s);
- The proposed total federal funding level, cost share and period of performance; and
- The proposed federal funding level and cost share for each project participant; and
- Statements regarding confidentiality, if applicable.
(2) Table of Contents: Applicant to capture, at a minimum, all the required sections identified in this table. The Table of Contents can be included on the Cover Page.
(3) Buy America Requirements for Infrastructure Projects. On or before the second (2) page of the narrative, include a short statement on whether the project will involve the construction, alteration, maintenance, and/or repair of public infrastructure in the United States. See Build America, Buy America (https://www.energy.gov/management/build-america-buy-america) for applicable definitions and other information to inform this statement. NOTE: The applicant must assume that the Build America, Buy America Act requirements are applicable to the purchase of equipment.
(4) Project Goals and Objectives (30%): This introductory section should provide a clear, concise statement of the specific objectives/aims of the proposed project. A "goal" is an outcome the proposed team would like to achieve, while an objective is an action or outcome related to a metric. Depending on Topic Area relevance, this section will form the basis for the (1) Safety, Security, and/or Operations, (2) Impact, and (3) Utilization, and/or (4) Education and/or Research Innovation review criteria (see Technical Review Criteria section). Goals and objectives should encompass the following where applicable (in no particular order):
- (a) How the request fills institutional and/or national infrastructure gaps and complements existing infrastructure and personnel capabilities.
- (b) How the proposed effort outcome or process will tie into the NE mission and/or NSUF (if applicable).
- (c) How procurement of equipment will enable the university’s learning mission, especially in support of NS&E R&D and education. This may include a description of existing programs or establishment of a new program. If proposing procurement of equipment, describe comparable equipment, if any, already at your organization or within the DOE complex and explain why it cannot be used. NOTE: Address any proposed equipment described in the Budget Justification document in the narrative.
- (d) How the utilization of the upgrades and/or equipment by researchers or educators within and external to your organization can benefit. NOTE: It is recommended to include target metrics of utilization by the proposing institution and others in the research community. If there is a preexisting capability, provide a description of how the upgrade or equipment will improve utilization.
- (e) (FOR GSI TOPIC AREA, IF APPLICABLE) Applicants targeting infrastructure upgrades for an existing or prospective NSUF partner facility are required to specifically address how the upgrades will enhance the NSUF program. Additionally, the applicant must address how the upgrades will maintain ongoing relevance at an NSUF partner facility.
- i. Visit the NSUF website (https://nsuf.inl.gov) and contact nsuf@inl.gov for information on becoming an NSUF partner.
- ii. If the NSUF determines the new equipment/capability adds significant value to DOE, the equipment/capability may be invited to join the NSUF, so the equipment is available to other researchers. Information about existing capabilities within the NSUF can be found on the website (https://nsuf.inl.gov) or a more general overview of capabilities throughout the world can be found in the NEID available at https://nsuf.inl.gov under Resources.
(5) Schedule and Task Descriptions (40%): This section should include a scope of work and execution plan with detail appropriate to the complexity of the project. This will form the basis for the Execution review criteria (see Technical Review Criteria). In addition, this section should describe, in detail, the individual tasks and their connection to the overall effort. Successful applicants must use their proposed project timetable to report progress. Include the following:
- (a) An overall timeline and key milestones of the proposed tasks (e.g., Gantt chart, timeline, etc.).
- (b) Applicants must demonstrate the NS&E R&D or educational connection between requested upgrades or equipment. Applications made of several uncorrelated equipment requests are not of interest.
- (c) Applicants should elaborate on integration of the requested upgrades or equipment into NS&E R&D or educational connection between requested upgrades or equipment.
(6) Relevance and Outcomes/Impacts (20%): This section is a justification for the proposed effort and should explain the relevance of the effort to the mission of NE and connect with the goals and objectives. This section should include a clear statement of the importance of the project in terms of the utility of the outcomes and the target community of beneficiaries. Depending on Topic Area relevance, this will form the basis for the (1) Impact and (2) Education and/or Research Innovation review criteria (see Technical Review Criteria). List all applicable NE funded R&D projects in this section and any NE R&D program relevance, if applicable.
(7) Roles of Participants (5%): Describe the capabilities and qualifications of the PI and key personnel involved to accomplish the proposed effort. This should include descriptions of specific personnel expertise required to accomplish the proposed effort. Specific individuals and skillsets should be referred to throughout the technical volume where appropriate and highlighted in this section. Directly state whether there is any expertise that must be acquired to complete the project and the plan to acquire the expertise (e.g., new hires, consultants, etc.).
(8) Facilities, Complementary Equipment, and Other Resources (5%): Identify the facilities (e.g., office, laboratory, computer, etc.), equipment (computers, oscilloscopes, etc.), and other resources (machine shops, electronic shops, etc.) to be used at each performance site. Describe utilization of facilities, equipment, and other resources that are directly applicable to the proposed work. Include pertinent capabilities, capacities, relative proximity, and extent of availability to the project.
C. Funding Restrictions
Program-specific funding restrictions applicable to awards funded under this NOFO are identified below. Standard funding restrictions are described in the NOFO Part 2, Funding Restrictions section.
Applicable Funding Restrictions
| Title | Location | Additional Information |
|---|---|---|
| Allowable Costs | NOFO Part 2 | Applicable to awards made under this NOFO |
| Pre-Award Costs | NOFO Part 2 | Applicable to awards made under this NOFO |
| Foreign Travel | NOFO Part 2 | Foreign Travel is not allowed for awards made under this NOFO |
| Lobbying | NOFO Part 2 | Applicable to awards made under this NOFO |
| Equipment and Supplies | NOFO Part 2 | Purchasing American-made equipment and supplies is applicable to this award. |
| Davis-Bacon Act Requirements | NOFO Part 2 | Applicable to awards made under this NOFO |
| Build America Buy America Requirements for Infrastructure Projects | NOFO Part 1 | Applicable to awards made under this NOFO |
1. Build America Requirement for Infrastructure Projects
Awards funded through this NOFO that are for, or contain, construction, alteration, maintenance, or repair of public infrastructure in the U.S. undertaken by applicable recipient types, require that:
- All iron, steel, and manufactured products used in the infrastructure project are produced in the United States; and
- All construction materials used in the infrastructure project are manufactured in the United States.
Please refer to the NOFO Part 2, Buy America Requirements for Infrastructure Projects; Required Use of American Iron, Steel, Manufactured Products, and Construction Materials and 2 CFR Part 184 to determine whether the Buy America Requirement applies and if they should consider the application of the Buy America Requirement in the proposed project’s budget and/or schedule. (Note that the Buy America Requirement does not apply to prime recipients that are For-Profit Entities.)
V. Submission Requirements and Deadlines
There are several one-time actions applicants must take before applying to this NOFO. Some of these may take several weeks, so it is vital applicants build in enough time to complete them. Failure to complete these actions could interfere with application or negotiation deadlines or the ability to receive an award if selected. These requirements are outlined in detail in the NOFO Part 2, Get Registered.
A. Required Registrations
1. Unique Entity Identifier (UEI) and System for Award Management (SAM)
You must have an active account with SAM.gov. This includes having a Unique Entity Identifier (UEI). SAM.gov registration can take several weeks. To register, go to SAM.gov Entity Registration and click Get Started. From the same page, you can also click on the Entity Registration Checklist for the information you will need to register.
Each applicant must:
- Be registered in SAM.gov before submitting an application;
- Provide a valid Unique Entity Identifier in the application; and
- Continue to maintain an active registration in SAM.gov with current information at all times during which you have an active federal award or an application or plan under consideration by a federal agency.
DOE may not make a federal award to an applicant until the applicant has complied with all applicable UEI and SAM requirements and, if an applicant has not fully complied with the requirements by the time DOE is ready to make a federal award, the DOE will determine that the applicant is not qualified to receive a federal award and use that determination as a basis for making a federal award to another applicant.
2. NEUP.gov
Register and create an account at www.NEUP.gov. Electronic applications and instructions are available at the NEUP.gov website. To access these materials:
- go to www.NEUP.gov;
- select “Sign In” from the top right-hand corner of the screen;
- enter your user credentials;
- select “Applications” from the menu; and
- click on “Create New Application” for the type of application you are creating.
If you have any questions about NEUP.gov site registration, application processes, eligibility, or application document requirements contact the Nuclear Energy External Innovation Integration Office at 208-526-4854 or at NEUP@inl.gov.
Each organization or business unit, whether acting as a team or a single entity, should use only one account as the contact point for each submission. Applicants must also designate backup points of contact. This step is required to apply to this NOFO.
B. Application Package
The application package requirements are outlined in the Application Content and Form section above. Several templates for application requirements are included at NEUP.gov. To access these materials, select the appropriate call under “My Applications” once logged into NEUP.gov.
Electronic Authorization of Applications and Award Documents
Submission of an application and supplemental information under this NOFO through electronic systems used by the DOE, including NEUP.gov, constitutes the authorized representative’s approval and electronic signature.
C. Submission Date and Times
All required submissions must be submitted via the NEUP.gov application site no later than 5 p.m. ET on the dates provided on Key Facts section.
Applicants are strongly encouraged to submit all required application documents at least 48 hours in advance of the submission deadline. Under normal conditions (i.e., at least 48 hours before the submission deadline), applicants should allow at least one hour to submit application documents. Once the application documents are submitted via the NEUP.gov application site, applicants may revise or update that submission until the expiration of the applicable deadline. If changes are made to any of these documents, the applicant must resubmit them before the applicable deadline. DOE will not extend the submission deadline for applicants that fail to submit required information by the applicable deadline due to server/connection congestion.
D. Intergovernmental Review
This NOFO is not subject to Executive Order 12372, Intergovernmental Review of Federal Programs.
VI. Application Review Information
A. Standards for Application Evaluation
Applications that are determined to be eligible will be evaluated in accordance with this NOFO and the guidance provided in the “DOE Merit Review Guide for Financial Assistance,” effective October 1, 2020, which is available at: https://energy.gov/management/downloads/merit-review-guide-financial-assistance-and-unsolicited-proposals-current.
B. Responsiveness Review
The following applications will be deemed nonresponsive and will not be reviewed or considered:
- Project concepts or approaches not based on established scientific principles.
- Project concepts or approaches identified specifically as NOT of interest (see the Applications Specifically Not of Interest section above).
C. Review Criteria
1. Compliance Criteria
Prior to a comprehensive technical merit review, NE will perform an initial compliance review. Applications that fail to pass the initial review will not be forwarded for merit review and will be eliminated from further consideration.
All applicant submissions for applications must:
- Be eligible for an award (see Eligible Applicants section);
- Not exceed the number of submissions permitted:
- No more than one (1) application per research reactor under Topic Area 1: RU; and
- No more than one (1) application under Topic Area 2: GSI;
- Comply with the applicable content and form requirements listed in Application Content Requirements and Submission Requirements and Deadlines of the NOFO Part 1 and 2;
- Include all required documents;
- Be uploaded successfully in https://NEUP.inl.gov site indicated in the Key Facts section above including clicking the “Submit” button; and
- Comply with the submission deadline stated in Key Facts.
DOE will not review or consider applications submitted through means other than the https://NEUP.inl.gov site indicated in Key Facts, applications submitted after the applicable deadline, or incomplete application packages.
Applicants are strongly encouraged to submit all required application documents at least 48 hours in advance of the submission deadline. Under normal conditions (i.e., at least 48 hours before the submission deadline), applicants should allow at least one hour to submit application documents. Once the application documents are submitted to https://NEUP.inl.gov identified in the Key Facts section, applicants may revise or update that submission until the expiration of the applicable deadline. If changes are made to any of these documents, the applicant must resubmit them before the applicable deadline. DOE will not extend the submission deadline for applicants that fail to submit required information by the applicable deadline due to server/connection congestion.
2. Technical Review Criteria
Applications
Relevancy Criteria
Following the initial compliance review, programmatic experts will assess relevance to the NE mission. All applications that meet the objectives of this NOFO will move forward to the technical review phase.
Technical Review Merit Criteria
The following evaluation criteria for each Topic Area will be utilized by the Technical Evaluation Committee and Federal Merit Review Panel members in conducting their evaluations of applications subjected to comprehensive merit review.
Topic Area 1: University Research Reactor Upgrades (RU) Infrastructure Support
CINR Reactor Upgrades Review Criterion Overview
| Criterion | Scoring Weight |
|---|---|
| Safety, Security, and/or Operations | 40% |
| Impact | 20% |
| Utilization | 20% |
| Execution | 20% |
Criterion 1: Safety, Security, and/or Operations (40%)
Potential of the requested equipment, instrumentation, or modification to:
- (a) Enhance the safety, performance, control, or operational reliability of research reactor systems; or
- (b) Increase the quality, safety/security, or efficiency of the operation of the research reactor facility.
Criterion 2: Impact (20%)
Potential of the requested equipment, instrumentation, or modification to facilitate, improve, or expand ongoing NE research and training capabilities.
Criterion 3: Utilization (20%)
As a result of the proposed equipment, the amount of student and faculty usage of the research reactor facility and the amount and variety of research and/or services actually provided by the facility.
Criterion 4: Execution (20%)
Capability to implement the full scope of the project, including timely project completion, personnel qualifications, budget, and feasibility.
Topic Area 2: General Scientific Infrastructure (GSI)
CINR General Scientific Infrastructure Review Criterion Overview
| Criterion | Scoring Weight |
|---|---|
| Impact | 25% |
| Utilization | 25% |
| Execution | 25% |
| Education and/or Research Innovation | 25% |
| Bonus: Nuclear Science User Facilities (NSUF) Priority | 0-3% |
Criterion 1: Impact (25%)
Potential of the requested equipment, instrumentation, or modification to facilitate, improve, or expand ongoing NE research, training, and NSUF capabilities (if applicable).
Criterion 2: Utilization (25%)
As a result of the proposed equipment, the amount of student, faculty, or researcher usage of the capabilities and the amount and variety of research and/or services actually provided by the facility.
Criterion 3: Execution (25%)
Capability to implement the full scope of the project including timely project completion, personnel qualifications, budget, and feasibility.
Criterion 4: Educational and/or Research Innovation (25%)
Uses of equipment for educational or research purposes.
Bonus Criterion: NSUF Priority (0-3%)
Up to 3 bonus points will be attributed if the proposed upgrade improves an existing NSUF partner facility or creates a capability that is identified as a prospective partner facility.
D. Other Selection Factors
In addition to the above criteria, the Selection Official may consider the following program policy factors in determining which applications to select for award negotiations:
- Degree to which proposed project optimizes/maximizes use of available NE funding to achieve DOE program goals and objectives. This includes how those infrastructure projects support NE research; it may also include how the infrastructure project supports other complementary efforts or projects, which, when taken together, will best achieve program research goals and objectoves.
- The degree to which the proposed project, including proposed cost share, optimizes the use of available DOE funding to achieve NE research goals and objectives.
- The degree to which the proposed project, or group of projects, represent a desired geographic distribution (considering past awards and current applications).
- The degree to which the proposed project will employ procurement of U.S. iron, steel, manufactured products, and construction materials.
- Other Cost/Budget considerations, including availability of funding.
- Extent that the applicant has awards in progress, or not completed, from NE, from a previous year’s award, or has existing no-cost time extensions.
- Demonstrated ability of the applicant to successfully complete projects (including relevant prior projects) and to do so within budget and within the specified timeframe of the award.
- Applicability of the infrastructure upgrades that could benefit multiple reactor technologies, including future design types.
- Impact on an existing NS&E program or a realistic plan to establish an NS&E program.
The Selection Official may consider any of the above factors independently in determining the optimum mix of applications that will be selected for support. These factors, while not indicators of the application’s merit, may be essential to the process of selecting the application(s) that, individually or collectively, will best achieve the program objectives. Such factors are often beyond the control of the applicant.
NE reserves the right to respond to potential shifts in priorities during FY 2026 that may be driven by events, policy developments, or Congressional/budget direction. NE will factor such considerations into decisions related to the timing and scale of award announcements associated with this NOFO.
NE reserves the right to award portions of a request so that available funding can have the highest impact for the nuclear energy community.
Applicants should recognize that some very good applications might not receive an award because of program policy factors and available funding. Therefore, the Selection Official may use program policy factors to assist in determining which applications shall receive DOE funding support.
VII. Selection and Award Notices
Please see the NOFO Part 2, Selection and Award Notices for information on notifications for Applications, Award Negotiations, and Post-Selection Information Requests.
VIII. Award Administration Information
A. Post-Award Requirements and Administration
DOE requires all award recipients to follow and accept requirements governed by laws and policies – both Federal Government-wide and DOE or program specific. These post-award requirements include all National and Administrative Policy Requirements; financial assistance general Certifications and Representations; Build America, Buy America requirements; Davis-Bacon Act requirements; Infrastructure Investment and Jobs Act-Specific Requirements; Fraud, Waste and Abuse requirements; Safety, Security, and Regulatory requirements; and Environmental Review in Accordance with National Environmental Policy Act requirements.
Post-Award requirements and administration applicable to awards funded under this NOFO are identified below. Detailed descriptions of standard funding restrictions are provided in the NOFO Part 2, Post-Award Requirements and Administration section. Detailed descriptions of program specific funding restrictions are provided below the table.
| Applicable Post-Award Requirements and Administration Title | Location |
|---|---|
| Award Administrative Requirements | NOFO Part 2 |
| Subaward and Executive Reporting | NOFO Part 2 |
| National Policy Requirements | NOFO Part 2 |
| Applicant Representations and Certifications | NOFO Part 2 |
| Statement of Federal Stewardship | NOFO Part 2 |
| Uniform Commercial Code (UCC) Financing Statements | NOFO Part 2 |
| Interim Conflict of Interest Policy for Financial Assistance | NOFO Part 2 |
| Whistleblower Protections | NOFO Part 2 |
| Fraud, Waste, and Abuse | NOFO Part 2 |
| Participants and Collaborating Organizations | NOFO Part 2 |
| Current and Pending Support | NOFO Part 2 |
| Prohibition Related to Malign Foreign Talent Recruitment Programs | NOFO Part 2 |
| Foreign Collaboration Considerations | NOFO Part 2 |
| U.S. Manufacturing Commitments | NOFO Part 2 |
| Subject Invention Utilization Reporting | NOFO Part 2 |
| Intellectual Property Provisions | NOFO Part 2 |
| Technology Protection Plan | NOFO Part 2 |
| Conference Spending | NOFO Part 2 |
| Cost-Share Payment | NOFO Part 2 |
| Implementation of Executive Order 13798, Promoting Free Speech and Religious Liberty | NOFO Part 2 |
| Applicable Post-Award Requirements and Administration Title | Location |
|---|---|
| Pay Transparency Requirements | NOFO Part 2 |
| Human Subjects Research | NOFO Part 2 |
| Real Property and Equipment | NOFO Part 1 |
| Rights in Technical Data | NOFO Part 1 |
1. Real Property and Equipment
Real property and equipment purchased with project funds (federal share and recipient cost share) are subject to the requirements at 2 CFR 200.310, 200.311, 200.313, and 200.316 (non-federal entities, except for-profit entities) and 2 CFR 910.360 (for-profit entities).
For resulting awards under this NOFO, the recipients may (1) take disposition action on the real property and equipment; or (2) continue to use the real property and equipment after the conclusion of the award period of performance with Grants Officer approval. The recipient’s written request for Continued Use must identify the property and include:
- a summary of how the property will be used (must align with the authorized project purposes);
- a proposed use period, (e.g., perpetuity, until fully depreciated, or a calendar date when the recipient expects to submit disposition instructions);
- acknowledgement that the recipient shall not sell or encumber the property or permit any encumbrance without prior written DOE approval;
- current fair market value of the property; and
- an estimated useful life or depreciation schedule for equipment.
When the property is no longer needed for authorized project purposes, the recipient must request disposition instructions from DOE. For-profit entity disposition requirements are set forth in 2 CFR 910.360. Property disposition requirements for other non-federal entities are set forth in 2 CFR 200.310 – 200.316. In addition, pursuant to the FY23 Consolidated Appropriations Act (Pub. L. No. 117-328), Division D, Title III, Section 309, at the end of the award period the Secretary or a designee of the Secretary, at their discretion, may vest unconditional title or other property interests acquired under this project regardless of the fair market value of the property.
2. Rights in Technical Data
Data rights differ based on whether data is first produced under an award or instead was developed at private expense outside the award.
“Limited Rights Data”: The U.S. Government will not normally require delivery of confidential or trade-secret-type technical data developed solely at private expense prior to issuance of an award, except as necessary to monitor technical progress and evaluate the potential of proposed technologies to reach specific technical and cost metrics.
Government Rights in Technical Data Produced Under Awards: The U.S. Government normally retains unlimited rights in technical data produced under government financial assistance awards, including the right to distribute to the public. However, pursuant to special statutory authority, certain categories of data generated under DOE awards under this NOFO may be protected from public disclosure for up to five years after the data is generated (“Protected Data”). For awards permitting Protected Data, the protected data must be marked as set forth in the award’s intellectual property terms and conditions and a listing of unlimited rights data (i.e., non-protected data) must be inserted into the data clause in the award. In addition, invention disclosures may be protected from public disclosure for a reasonable time in order to allow for filing a patent application.
3. Cost Share Payment
If cost share is proposed in the application, DOE requires recipients to contribute the cost share amount incrementally over the life of the award. Specifically, the recipient’s cost share for each billing period must always reflect the overall cost share ratio negotiated by the parties (i.e., the total amount of cost sharing on each invoice when considered cumulatively with previous invoices must reflect, at a minimum, the cost sharing percentage negotiated).
B. Questions and Support
1. Questions
Upon the issuance of a NOFO, DOE personnel are prohibited from communicating (in writing or otherwise) with applicants regarding the NOFO except through the established question and answer process described below. Questions regarding this NOFO must be submitted to NEUP@inl.gov no later than three (3) business days prior to the application due date and time. Please note, feedback on individual concepts will not be provided through Q&A.
All questions and answers related to this NOFO will be posted on the NEUP.gov site listed in the Key Facts section above. DOE will attempt to respond to a question within three (3) business days unless a similar question and answer has already been posted on the website.
Questions related to the registration process and use of the NEUP.gov site listed in the Key Facts section should be submitted to NEUP@inl.gov.
2. Support
- Grants.gov: Grants.gov provides 24/7 support. You can call 1-800-518-4726 or email support@grants.gov. Retain your ticket number.
- SAM.gov: If you need help, you can call 866-606-8220 or live chat with the Federal Service Desk (https://www.fsd.gov/gsafsd_sp).
- NEUP.gov: If you have any questions about NEUP.gov site registration, application processes, eligibility, or application document requirements contact the Nuclear Energy External Innovation Integration Office at 208-526-4854 or at NEUP@inl.gov.
IX. Other Information
Please see the NOFO Part 2, Other Information for additional information and requirements that apply to all DOE NOFOs.
FY26 Scientific Infrastructure Support for CINR NOFO Part 1 — Amendment 1 (03MAR2026)
Financial Assistance
Notice of Funding Opportunity
Part 1
Department of Energy (DOE) Idaho Operations Office
Fiscal Year 2026 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research
Notice of Funding Opportunity Number: DE-FOA-0003541
Application due: April 9, 2026, at 5:00 p.m. Eastern Time
Modifications to this NOFO will be posted on NEUP.gov and Grants.gov. Grants.gov will automatically notify applicants when a NOFO modification is processed. Applicants must be registered to this NOFO in Grants.gov to receive email notifications. See Registration Requirements in Part 2 of this NOFO.
Modifications
| Mod. No. | Date | Description of Modification |
|---|---|---|
| 001 | 03/03/26 | Clarify and revise the bullet points in Section 3E (Program Description – Applications Specifically Not of Interest). |
Table of Contents
BEFORE YOU BEGIN
- Navigating the Notice of Funding Opportunity
I. BASIC INFORMATION
A. Key Facts
- Funding Details
- Period of Performance
B. Executive Summary
C. Agency Contact Information
II. ELIGIBILITY
A. Eligible Applicants
- Restricted Eligibility
- Domestic Entities
- Foreign Entity Participation
- Participant Limitations
- Performance of Work in the U.S.
- Ineligible Participants
- Entity of Concern Prohibition
B. Limitation on Number of Applications Eligible for Review
C. Cost Sharing - Cost Share Requirements
- Unallowable Cost Share Sources
D. FFRDC Eligibility Criteria
III. PROGRAM DESCRIPTION
A. Program Purpose
B. Program Goals and Objectives
C. Expected Performance Goals
D. Topic Areas
E. Applications Specifically Not of Interest
F. Statutory Authority
IV. APPLICATION CONTENT AND FORM
A. Summary
B. Application Content Requirements
- Covered Individual Definition, Designation, and Responsibility
- Summary of Application Requirements
- Technical Volume
C. Funding Restrictions - Build America Requirement for Infrastructure Projects
V. SUBMISSION REQUIREMENTS AND DEADLINES
A. Required Registrations
- Unique Entity Identifier (UEI) and System for Award Management (SAM)
- NEUP.gov
B. Application Package
C. Submission Date and Times
D. Intergovernmental Review
VI. APPLICATION REVIEW INFORMATION
A. Standards for Application Evaluation
B. Responsiveness Review
C. Review Criteria
- Compliance Criteria
- Technical Review Criteria
D. Other Selection Factors
VII. SELECTION AND AWARD NOTICES
VIII. AWARD ADMINISTRATION INFORMATION
A. Post-Award Requirements and Administration
- Real Property and Equipment
- Rights in Technical Data
- Cost Share Payment
B. Questions and Support - Questions
- Support
IX. OTHER INFORMATION
Full announcement text, formatted for readability.